[
https://issues.apache.org/jira/browse/TEZ-2300?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14718026#comment-14718026
]
TezQA commented on TEZ-2300:
----------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12752930/TEZ-2300.8.patch
against master revision 77efbc3.
{color:red}-1 patch{color}. The patch command could not apply the patch.
Console output: https://builds.apache.org/job/PreCommit-TEZ-Build/1042//console
This message is automatically generated.
> TezClient.stop() takes a lot of time or does not work sometimes
> ---------------------------------------------------------------
>
> Key: TEZ-2300
> URL: https://issues.apache.org/jira/browse/TEZ-2300
> Project: Apache Tez
> Issue Type: Bug
> Reporter: Rohini Palaniswamy
> Assignee: Jonathan Eagles
> Attachments: TEZ-2300.1.patch, TEZ-2300.2.patch, TEZ-2300.3.patch,
> TEZ-2300.4.patch, TEZ-2300.5.patch, TEZ-2300.6.patch, TEZ-2300.7.patch,
> TEZ-2300.8.patch, syslog_dag_1428329756093_325099_1_post
>
>
> Noticed this with a couple of pig scripts which were not behaving well (AM
> close to OOM, etc) and even with some that were running fine. Pig calls
> Tezclient.stop() in shutdown hook. Ctrl+C to the pig script either exits
> immediately or is hung. In both cases it either takes a long time for the
> yarn application to go to KILLED state. Many times I just end up calling yarn
> application -kill separately after waiting for 5 mins or more for it to get
> killed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)