[
https://issues.apache.org/jira/browse/TEZ-2761?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14729516#comment-14729516
]
TezQA commented on TEZ-2761:
----------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12754035/TEZ-2761.3.patch
against master revision a0d59c3.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 2 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 3.0.1) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in .
Test results:
https://builds.apache.org/job/PreCommit-TEZ-Build/1070//testReport/
Console output: https://builds.apache.org/job/PreCommit-TEZ-Build/1070//console
This message is automatically generated.
> Tez UI: update the progress on the various pages on the UI
> ----------------------------------------------------------
>
> Key: TEZ-2761
> URL: https://issues.apache.org/jira/browse/TEZ-2761
> Project: Apache Tez
> Issue Type: Sub-task
> Components: UI
> Reporter: Prakash Ramachandran
> Assignee: Prakash Ramachandran
> Attachments: TEZ-2761.1.patch, TEZ-2761.2.patch, TEZ-2761.3.patch,
> TEZ-2761.wip.1.patch
>
>
> The data displayed on the UI for running tasks should be updated with the
> latest status fetched from AM.
> This includes the status, progress, task count etc. The api should also allow
> querying the values for the tasks (running, failed, succeeded...).
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)