[ 
https://issues.apache.org/jira/browse/TEZ-2872?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14951185#comment-14951185
 ] 

Hitesh Shah commented on TEZ-2872:
----------------------------------

bq. If all user payloads are combined into a local resource at the dag level

In this case, but this too depends on whether the spec is modified by any of 
the vertex managers. 

> Tez AM can be overwhelmed by TezTaskUmbilicalProtocol.getTask responses
> -----------------------------------------------------------------------
>
>                 Key: TEZ-2872
>                 URL: https://issues.apache.org/jira/browse/TEZ-2872
>             Project: Apache Tez
>          Issue Type: Bug
>            Reporter: Jason Lowe
>
> When a large job runs on a large cluster with a large user payload then the 
> AM can end up hitting OOM conditions.  For example, Pig-on-Tez can require a 
> significant user payload (approaching 1MB) for vertices, inputs, and outputs 
> in the DAG.  This can cause the ContainerTask response to be rather large per 
> task, which can lead to a situation where the AM is generating output faster 
> than the network interface can process it.  If there are enough containers 
> asking for tasks then this leads to an OOM condition.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to