Rajesh Balamohan created TEZ-2897:
-------------------------------------

             Summary: Consider plotting concurrent task details in critical 
path analyzer
                 Key: TEZ-2897
                 URL: https://issues.apache.org/jira/browse/TEZ-2897
             Project: Apache Tez
          Issue Type: Bug
            Reporter: Rajesh Balamohan


TEZ-2888 adds concurrency details by time within the DAG. It would be good to 
consider adding the concurrency details in the timeline axis in SVG. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to