[
https://issues.apache.org/jira/browse/TEZ-394?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16286501#comment-16286501
]
TezQA commented on TEZ-394:
---------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12869675/TEZ-394.003.patch
against master revision cfede26.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 1 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 3.0.1) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in .
Test results:
https://builds.apache.org/job/PreCommit-TEZ-Build/2700//testReport/
Console output: https://builds.apache.org/job/PreCommit-TEZ-Build/2700//console
This message is automatically generated.
> Better scheduling for uneven DAGs
> ---------------------------------
>
> Key: TEZ-394
> URL: https://issues.apache.org/jira/browse/TEZ-394
> Project: Apache Tez
> Issue Type: Sub-task
> Reporter: Rohini Palaniswamy
> Assignee: Jason Lowe
> Attachments: TEZ-394.001.patch, TEZ-394.002.patch, TEZ-394.003.patch
>
>
> Consider a series of joins or group by on dataset A with few datasets that
> takes 10 hours followed by a final join with a dataset X. The vertex that
> loads dataset X will be one of the top vertexes and initialized early even
> though its output is not consumed till the end after 10 hours.
> 1) Could either use delayed start logic for better resource allocation
> 2) Else if they are started upfront, need to handle failure/recovery cases
> where the nodes which executed the MapTask might have gone down when the
> final join happens.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)