https://issues.apache.org/jira/browse/YUNIKORN-2689?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Hengzhe Guo updated YUNIKORN-2689:
----------------------------------
Description: When a queue is removed but still has jobs running in it, it
will be in 'draining' state. At this stage, if the queue is added back, we
should expect the queue to be transitioned back to active state. However, such
transition is not found in the code base. We observed a case where a queue
removed and soon added back eventually ended up deleted after all jobs were
drained. (was: When a queue is removed but still have jobs running in it, it
will be in 'draining' state. At this stage, if the queue is added back, we
should expect the queue to be transitioned back to active state. However, such
transition is not found in the code base. We observed a case where a queue
removed and soon added back eventually ended up deleted after all jobs were
drained.)
> transition draining queues back to active if they are added back
> ----------------------------------------------------------------
>
> Key: YUNIKORN-2689
> URL: https://issues.apache.org/jira/browse/YUNIKORN-2689
> Project: Apache YuniKorn
> Issue Type: Bug
> Reporter: Hengzhe Guo
> Priority: Minor
>
> When a queue is removed but still has jobs running in it, it will be in
> 'draining' state. At this stage, if the queue is added back, we should expect
> the queue to be transitioned back to active state. However, such transition
> is not found in the code base. We observed a case where a queue removed and
> soon added back eventually ended up deleted after all jobs were drained.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]