Dear businee partners ,
I hope you are doing great.
please find the below requirement with our client and share consultant
resume to [email protected]
*Project Manager *
*Location: Austin, TX*
*Duration: 12 Months*
*Note: Travel will be required to different locations of Client Offices.*
* Minimum Requirements:*
Years
Skills/Experience
8
Extensive work experience and understanding of project management life
cycle (PMLC) and system development life cycle (SDLC) methodologies.
8
Experience in identifying potential project risks and issues and
documenting strategies to accept, mitigate, or avoid.
8
Experience in conducting meetings and/or presentation preparation tasks as
needed (e.g., prepare or oversee preparation of and provide agendas and
pre-meeting materials as well as follow-up notes, post meeting materials,
assignment follow-up and related activities).
8
Experience in MS Office Suite.
Strong
Must have strong writing, analytical, interpersonal, organizational, and
communications skills with project management experience.
* Preferences:*
Years
Skills/Experience
5
Experience working in a state/federal government environment
5
Project Management Professional (PMP) certification.
*Task 1. **Work Prioritization:*
· Work with PM, SSLC Facilities Director and IT IO Director to
prioritize each building within a site based on the number of aggregation
points from each building.
· Prioritize each SSLC based on the current risk level.
· Work with the PM, SSLC Facilities Director and IT IO Director to
gather required information to include but not limited to:
- Building construction
- Detailed building diagrams containing
§ Size
§ Construction material
§ Room placement
§ Existing cabling
- Facility layout including but not limited to:
§ Building distance
§ Soil composition
§ Existing fiber location
§ Trenching constraints
· install Intrusion Prevention System hardware/software to monitor
network and/or system activities for security purposes.
· Develop 3 site packages containing four SSLCs per package. Each
package could be aligned but not limited to:
- Geographical location
- Number of high, medium, and low priority sites.
*Task 2. **Detailed Assessment:*
· Identify a representative sample of SSLC sites for the following
steps.
- Fiber plant assessment at each of the representative sampling of the
SSLC sites.
- Wireless heat map for Signal penetration at each of the
representative sampling of the SSLC sites
*Task 3. **Design and Implementation SOW:*
· The written approach should require:
- Participation of a vendor walk-through of the representative sites
· Each approach should include:
- A detailed bill of material,
- fixed price cost for each of the sites within a package.
--
Thanks & Regards,
*Ashok CH |*
*Infolob Solutions Inc.|*|Office: 972-535-5559 Ext 107 |Fax: 888-228-4125
Email: [email protected] |www.infolob.com |
*A MBE COMPANY | ORACLE PLATINUM PARTNER COMPANY*
------------------------------------------------------------------------------
--
You received this message because you are subscribed to the Google Groups "it
req" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/it-req.
For more options, visit https://groups.google.com/groups/opt_out.