On Tue, Sep 11, 2012 at 7:06 PM, Hiranya Jayathilaka
<[email protected]> wrote:
> What about JIRA and other project resources? Are we going to get rid of the
> TRANSPORTS JIRA project and make it a component of the Axis2 JIRA project?

Versions in JIRA are defined at the project level. If we move the
transports to Axis2 core, they will have the same release cycle as the
rest of Axis2 and therefore use the same versions. Therefore it would
probably make the most sense to leave issues solved in Axis2
Transports 1.0.0 in the TRANSPORTS project and move unresolved issues
and issues solved only in trunk to the AXIS2 project.

> Thanks,
> Hiranya
>
> On Mon, Sep 10, 2012 at 5:21 AM, Andreas Veithen <[email protected]>
> wrote:
>>
>> For various reasons, there have been no releases of the Axis2
>> Transports subproject since the migration of Axis/Axis2 to a TLP. To
>> change that situation I would like to propose to move that code to
>> Axis2 core, with the exception of the SMS transport (more on this
>> restriction later).
>>
>> Doing this has a couple of advantages:
>>
>> * All transports will be released together with every Axis2 release.
>> * Changes in ASF policies (related to the release process, branding
>> guidelines, etc.) no longer need to be implemented separately for
>> Axis2 Transports.
>> * For Axis2 core we manage at least one maintenance branch, and over
>> the last couple of years we have successfully produces several
>> maintenance releases from these branches. If we move the transports to
>> core, then they will also benefit from that.
>> * It eliminates the strange situation where the HTTP transport is
>> included in Axis2 core, but part of the unit tests are in Axis2
>> Transports.
>>
>> The Axis2 Transports project is fairly easy to integrate into Axis2
>> core (in contrast to Rampart and Sandesha2, which is the reason these
>> projects are not included):
>>
>> * The documentation has one page per transport. This makes it easy to
>> integrate it into the main site (and to set up the necessary redirects
>> from the old locations).
>> * With the exception of the SMS transport, only Apache controlled
>> Maven repositories are used. This is important because in the past,
>> there have been several occasions where the Axis2 core build broke
>> because of non Apache repositories. We must not allow that to happen
>> again in the future.
>> * With the exception of the SMS transport, the Axis2 Transport build
>> is very stable. It is as least as stable as the Axis2 core build. Only
>> the build of the SMS transport is not stable because it randomly fails
>> as described in TRANSPORTS-20 (which has been open for more than 2
>> years now).
>> * It takes less than 3 minutes to build Axis2 Transport. Therefore
>> moving that code to Axis2 core would only marginally increase the
>> build time.
>>
>> The SMS transport would be moved later once the issues mentioned above
>> have been fixed. Note that after moving the other transports to Axis2
>> core we also have the option to merge these changes to the 1.6 branch
>> so that the Axis2 1.6.3 release would already contain them.
>>
>> Andreas
>>
>> ---------------------------------------------------------------------
>> To unsubscribe, e-mail: [email protected]
>> For additional commands, e-mail: [email protected]
>>
>
>
>
> --
> Hiranya Jayathilaka
> Mayhem Lab/RACE Lab;
> Dept. of Computer Science, UCSB;  http://cs.ucsb.edu
> E-mail: [email protected];  Mobile: +1 (805) 895-7443
> Blog: http://techfeast-hiranya.blogspot.com

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to