Robert Engels wrote:
I think this is great, and it gave me an idea. What if another thread could
call a "stop optimize" which would stop the optimize after it came to a
consistent state (not in the middle of a segment merge).
We schedule our optimizes for the "lull" time period, but with 24/7 operation
this could be hard to find.
Being able to stop and then resume the optimize seems like a great idea.
+1. It would be useful in shutdown cases where immediate shutdown is needed, or
to allow a scheduled backup to kick in at a fixed time, rather than having to
wait for optimize to complete. Or is there another way to interrupt optmimize
safely?
Antony
---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]