> Correction: the optimization period was actually Jan 3, 2011 to end of March
> 2011.


The "Use data range from:" feature in optimization window, is for
optimization and backetesting stages?

I mean, the optimization results that we get after the optimization
process with specific data range include data out of the specified
range?


-- 
You received this message because you are subscribed to the Google Groups 
"JBookTrader" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/jbooktrader?hl=en.

Reply via email to