"kukeltje" wrote : due dates can use EL now as well (see the docs) That way you 
can set an absolute due date if it e.g. is in a processvariable.

Thanks, had done this with an action handler, as per the example on the wiki 
contributions page.

"kukeltje" wrote : And if the 'start date' does not need to be real (the task 
appearing at that time), use just a processvariable for that. If you do want 
see the task not before that specific date, use a state with a timer that 
transitions to the task if the timer is fired

I guess the processvariable approach is the way to go, I was wondering if there 
was something built in that I missed i.e. task to start no earlier than and 
finish no later than, or a task duration. This would be useful for assigning 
actors based on existing task assignments.


P.S. Is there any interest in an iCalendar wrapper such as I've described?

View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4133727#4133727

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4133727
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to