Hi,

I have an application which is running successfully in jboss 3.2.5. As per the 
new requirment i need to add one more ear file which has a different work flow. 
Is it possible to deploy two different ear in a single jboss, then how the ds 
file will work for different database connection ? Which is the best design 
that i can do with this requirment ? 

Please guild me 

Thanks and Regards
Rasa.

View the original post : 
http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4222843#4222843

Reply to the post : 
http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=4222843
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to