Thanks for replying...

  Well, I warned the customer saying it might be possible but there would not 
be any "roll back"... Which means that things already done (actions, 
logging...etc...) are done and won't be undone by any "roll back" function 
beside setting back the Token to a previous node. 

For example if in the node 4 a variable called Name has been set to "Bernie", 
and the Token is set back from node 8 to node 4, the variable Name would still 
be set to "Bernie". It would be the same as if there was a transition... The 
difference is that the transition does not exist on the graph.
The customer is ok with that...

Beside the "roll back" aspect... Do you see any other possible issues then ?

Thanks,

View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=3984357#3984357

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=3984357
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to