It seems the JBoss connection manager ignores the ConnectionRequestInfo when
allocating new connections. What I do is:
conn1 = mycf.getConnection("abc");
conn2 = mycf.getConnection("def");
The connection factory basically passes the parameter as a
ConnectionRequestInfo to the ConnectionManager.allocateConnection method. As it
seems the connection manager always wants to return the same connection, even
though the ConnectionRequestInfo for conn2 is different from conn1.
Can anybody confirm this?
I circumvented the problem by eliminating the parameter from getConnection.
Thus I don't care anymore if I get the same connection back. But it still
leaves me with a feeling that the JBoss ConnectionManager violates the JCA
specs.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=3990108#3990108
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=3990108
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user