Hello @ all,

we have an application running with Jboss ejb3 configuration. The Database is 
Oracle 10g. On jboss startup (or application deployment) we load an amount of 
data from the database with entity-manager and ejb3-entity-beans in mbean.
We used to run our application with jboss 4.0.4RC1 where load time was about 20 
minutes. Now we switched to 4.0.5-GA and the starttime has doubled to about 40 
minutes. The performance of the application itself seems to be unchanged.

additional information:
The Server is running under Windows Xp, Windows 2003 and Suse Linux Enterprise 
Server 9. The loading performance is the same on all systems.

Hope anyone can help

kind regards

kristina

View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4054219#4054219

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4054219
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to