Hi,

We have a requirement where in async processing has to be done in parallel for 
two of the tasks and the combined result should be sent to the requestor in a 
third asnych processing. 
Is this possible with JBossMQ?

Process 1 > MDB1  processing
Process 2 > MDB2 processing

Process 3 > MDB3 processing (when both the MDB1 and MDB2 processing is 
completed)

Need some help/insight if this can be achieved in JbossMQ.
Please forward the links/documentation to achieve the same if possible.

Thanks,



View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4073500#4073500

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4073500
_______________________________________________
jboss-user mailing list
[email protected]
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to