Hello

is it possible to define in a task-node a transition dinamically, that is, from 
it you can exit through 2 nodes (for example) but you can define in a class or 
so a third (even dinamically) to a existing node.

Another possibility would be to define at the very beginning this 3 transitions 
but "hide" one of them to the user, so for them it does not appear as a 
possible transition button.

Thanks...

View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=3925566#3925566

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=3925566


-------------------------------------------------------
This SF.net email is sponsored by: Splunk Inc. Do you grep through log files
for problems?  Stop!  Download the new AJAX search engine that makes
searching your log files as easy as surfing the  web.  DOWNLOAD SPLUNK!
http://sel.as-us.falkag.net/sel?cmd=lnk&kid=103432&bid=230486&dat=121642
_______________________________________________
JBoss-user mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/jboss-user

Reply via email to