Hi Andy,

We did not plan to have another release of Apache JDO before final. There's one final addition to the TCK (the PMF close test) before it's final. I can branch the repository on Monday and stage a release on my home directory at Apache for final testing.

Since tck20 final depends on JPOX which depends on api20, maybe it makes more sense to stage all three together. Is the intermediate JPOX rc2 really necessary?

Craig


On Mar 26, 2006, at 7:49 AM, Andy Jefferson wrote:

3. JSR 243 next steps (Craig). New and updated TCK tests need to
be finalized, and then we can cut the release branch.
JPOX is preparing a 1.1.0-rc2 for early next week, with the final
1.1.0 release scheduled for next Friday. The final artifact-id is
expected to be jpox-1.1.0.

Is there going to be a jdo2-api 2.0-rc2 release ? If so, when ?
There was a method signature change in FetchPlan (getGroups) since rc1, and JPOX
1.1.0-rc-2 will be dependent on it.

--
Andy


Craig Russell
Architect, Sun Java Enterprise System http://java.sun.com/products/jdo
408 276-5638 mailto:[EMAIL PROTECTED]
P.S. A good JDO? O, Gasp!

Attachment: smime.p7s
Description: S/MIME cryptographic signature

Reply via email to