Craig,
Does this mean there will be no more check-ins? Or will we just check
in to both trunk and release branch for the few remaining issues?
-- Michelle
Craig L Russell wrote:
Javadogs,
I'm planning on cutting the release branch for JDO 2.0 tomorrow. There
are three open issues that I'm aware of:
1. The test with persistent interfaces doesn't work yet; I believe
that this is a JPOX bug that will be fixed without a new release of
the API or TCK.
2. The TCK only supports datastore identity with strategy="identity".
This is an issue for vendors who cannot use this strategy for
databases that do not support the SQL GENERATED ... AS IDENTITY
construct for schema. I believe that we can resolve this TCK issue
after release of 2.0.
3. Synchronization with JPOX final 1.1.0 release. The JPOX team need
to have an api20 release post-jdo-2.0-rc1 that includes a signature
change for a FetchPlan method. But I think that it's going to have to
either depend on a SNAPSHOT api20 or a renamed api20 release for
testing. Similarly, for testing the jdo 2.0 bits, we will need to test
with SNAPSHOT JPOX bits renamed to jpox-1.1.0.
Please let me know if you feel that it is not appropriate to start the
release process with the api20 and tck20 bits currently checked into SVN.
Thanks,
Craig
Craig Russell
Architect, Sun Java Enterprise System http://java.sun.com/products/jdo
408 276-5638 mailto:[EMAIL PROTECTED]
P.S. A good JDO? O, Gasp!