|
||||||||
|
This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators. For more information on JIRA, see: http://www.atlassian.com/software/jira |
||||||||
- [JIRA] (JENKINS-9913) Concurrent build... [email protected] (JIRA)
- [JIRA] (JENKINS-9913) Concurrent ... [email protected] (JIRA)
- [JIRA] (JENKINS-9913) Concurrent ... [email protected] (JIRA)
- [JIRA] (JENKINS-9913) Concurrent ... [email protected] (JIRA)

A short test confirms what Logan Mattox observed: it's due to the e-mail notifications (both with the built-in "E-Mail Notification" post-build action, and the email-ext plugin).
Other post-build actions don't seem to trigger the problem: I tried launching a downstream job, and this allows build #2 to complete before #1.