|
||||||||
|
This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators. For more information on JIRA, see: http://www.atlassian.com/software/jira |
||||||||
- [JIRA] (JENKINS-15884) Release reso... [email protected] (JIRA)
- [JIRA] (JENKINS-15884) Release... [email protected] (JIRA)
- [JIRA] (JENKINS-15884) Release... [email protected] (JIRA)

I have the same problem. Or similar. I have a matrix job where the managed resource name is given through a variable ${TEST_NODE}, using the DynamicAxis plugin. It works fine as long as the job succeeds, but if it fails, the resource is still locked.