Hi Alex,

I'm not entirely sure this is the right place to ask (actually I'm sure it isn't). I've added the option to compress the build log before attaching it to the email, I've tested the change on my local jenkins instance, and would like to push the change back into the email-ext repo, but I'm not sure what the process is, for now I've attached a git patch file to this ticket.

Change By: Mark Orchard (22/Feb/13 8:55 PM)
Attachment: zip-build-before-attach.diff
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira

--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Reply via email to