Issue Type: Improvement Improvement
Assignee: stevengbrown
Components: timestamper
Created: 21/Mar/13 4:21 PM
Description:

The suggestions is to have an additional option for showing the delta in the logged time from one line to the next, e.g. for a log that would look like this today:

0:00:00.0  Job start
0:00:00.0  First step takes 1.1 seconds
0:00:01.1  Second step takes 12.4 seconds
0:00:13.5  Third step takes 5.0 seconds
0:00:18.5  Job done

It would look like this with the 'elapsed' option:

0:00:00.0  Job start
0:00:01.1  First step takes 1.1 seconds
0:00:12.4  Second step takes 12.4 seconds
0:00:05.0  Third step takes 5.0 seconds
0:00:18.5  Job done
Project: Jenkins
Priority: Minor Minor
Reporter: Rob Fagen
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira

--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Reply via email to