Issue Type: Bug Bug
Affects Versions: current
Assignee: Unassigned
Components: matrix
Created: 31/May/13 8:44 PM
Description:

I have a top level job X. In X, I am using kicking off job Y using the File Parameter Factory option in parameterized builds. The configuration files contain a property, axis_values, which is a space separated list of different axis's for job Y.

Let's say that job X has one configuration file and it contains axis_values=A B C. I kick off job X, which in turn kicks one instance of job Y. Job Y iterates correctly through A, B and C.

Next, I change the configuration file and I set axis_values=A B C D E. I kick off job X and job Y starts. Job Y runs correctly for A, B and C. But, job Y fails to run D and E. It says that "D appears to be cancelled" and "E appears to be cancelled".

I see the following in the log:

31-May-2013 3:57:48 PM hudson.model.Executor run
SEVERE: Executor threw an exception
java.lang.NullPointerException
at hudson.model.Executor.run(Executor.java:238)

The only workaround that I have found is that it will work correctly if I put the new values at the start of the axis. (ie. axis_values=D E A B C)

List of (possibly) relevant plugins installed;

  • dynamic axis
  • environment injector
  • jenkins parameterized trigger
  • matrix sorter
  • node and label parameter plugin
Environment: Windows
Project: Jenkins
Priority: Critical Critical
Reporter: tim johnston
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira

--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Reply via email to