![]() |
|
|
|
|
Issue Type:
|
Bug
|
|
Assignee:
|
nalin_makar
|
|
Components:
|
testng |
|
Created:
|
05/Jun/13 8:46 AM
|
|
Description:
|
The total time for a test class should include the configuration methods.
Otherwise the total time reported can be quite confusing, because it's much lower than expected.
E.g. I have on the test overview:
Class: a.b.c.SmokeTest, Duration: 472 msec
but when I drill down to the test, I get:
Test Methods
testStartup, Duration: 472 msec
Configuration Methods
springTestContextPrepareTestInstance, Duration 6 sec 348 msec
|
|
Project:
|
Jenkins
|
|
Priority:
|
Major
|
|
Reporter:
|
kutzi
|
|
|
|
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira
|
--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
[email protected].
For more options, visit
https://groups.google.com/groups/opt_out.