![]() |
|
|
|
|
Issue Type:
|
New Feature
|
|
Affects Versions:
|
current |
|
Assignee:
|
huybrechts
|
|
Components:
|
parameterized-trigger |
|
Created:
|
25/Jun/13 1:22 PM
|
|
Description:
|
When I set the "Projects to build" to a multiple list of jobs, I'd like the option to run them serialized and not parallel.
A use case:
- I set the "Projects to build" to jobs A,B,C.
- Job B needs the output of an action from job A and C needs from A and B.
Chaining them hard coded in not acceptable as the "Projects to build" chain is dynamic and is a parameter itself.
|
|
Environment:
|
All
|
|
Project:
|
Jenkins
|
|
Priority:
|
Minor
|
|
Reporter:
|
Eldad Assis
|
|
|
|
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira
|
--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
[email protected].
For more options, visit
https://groups.google.com/groups/opt_out.