It sounds like parallel returns a map from job-label to job-status.

Currently to branch return value (not a status per se), but see my comment in JENKINS-26033.

the job-status would be "failed" for the job that failed, and "cancelled" for the sibling jobs that were cancelled.

There is only one “job”, the workflow as a whole, a build of which is marked as a failure if any of the parallel branches fail—unless you have a try/catch block outside parallel which does something else.

Change By: Jesse Glick (12/Dec/14 4:19 PM)
Assignee: Jesse Glick Kohsuke Kawaguchi
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira

--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to