Hi, Using multi-configuration job, I am trying to have - on the first axis my deps (deps0, deps1, deps2 and need to keep them done in this order). - on the second axis one my targets (t0, t1) order can be random here.
When I run my job, order seems to be random even with the option "Run each configuration sequentially" Is there a way to specify the order of each work? And concurrency for each axis? Regards trax -- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/groups/opt_out.
