Setting B as a downstream project to A and using the threshold as "Only if the build succeeds".
On Aug 1, 2013, at 9:10 AM, Tânia Magalhães <[email protected]> wrote: > If I have 2 jobs (A and B). > A should run before B. > B doesn't need to run right after A ends. > But B can only run if the last build of A succeeded. > > Is there a way to set this? Some configuration on job B such as: "Build only > if the last build of this job succeeded: (and enter the jobs name) A" > > Thanks > > -- > You received this message because you are subscribed to the Google Groups > "Jenkins Users" group. > To unsubscribe from this group and stop receiving emails from it, send an > email to [email protected]. > For more options, visit https://groups.google.com/groups/opt_out. > > -- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/groups/opt_out.
