Setting B as a downstream project to A and using the threshold as "Only if the 
build succeeds".

On Aug 1, 2013, at 9:10 AM, Tânia Magalhães <[email protected]> wrote:

> If I have 2 jobs (A and B).
> A should run before B.
> B doesn't need to run right after A ends.
> But B can only run if the last build of A succeeded.
> 
> Is there a way to set this? Some configuration on job B such as: "Build only 
> if the last build of this job succeeded: (and enter the jobs name) A"
> 
> Thanks
> 
> -- 
> You received this message because you are subscribed to the Google Groups 
> "Jenkins Users" group.
> To unsubscribe from this group and stop receiving emails from it, send an 
> email to [email protected].
> For more options, visit https://groups.google.com/groups/opt_out.
>  
>  

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to