Hi All,

Job A is a build job that is triggered by SCM changes, and Job B is a
downstream test job configured to use the same node and same workspace.

If Job A #1 is currently running, and Job A receives another trigger from
SCM (Job A #2), how do I ensure that Job B #1 (which hasn't been triggered
yet) takes precedence over Job A #2 for that one executor spot available on
the machine?

Thanks,
Mishael

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to