It seems that polling job is not queued when manually started job is 
already running. Instead polling job is trying to run at the same time.

I have a Jenkins configured to Mac mini for iOS projects. Let's say I have 
two jobs: 

- Job A is scheduled periodically or started manually. This job runs 
functional tests on simulator.
- Job B is triggered by poll every 15 minutes. This job runs unit tests on 
simulator.

The problem is that when I start job A and it will run 40 minutes, the job 
B will start meanwhile and it tries to run at the same time with job A.
Queuing is working fine with several scheduled jobs but not with polling 
job.

Why job B is not queued? Any thoughts?

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to