I think you can only do that in each job definition, that is in the 
specification for Job1, 2, and 3. I don’t think you can pass anything to the 
build method to do that.

From: [email protected] 
[mailto:[email protected]] On Behalf Of [email protected]
Sent: Thursday, March 27, 2014 11:36 AM
To: [email protected]
Subject: Parallel builds with Build Flow

Build Flow plugin allows one to have parallel builds in a simple way:

parallel (

    // job 1, 2 and 3 will be scheduled in parallel.

    { build("job1") },

    { build("job2") },

    { build("job3") }

)

// job4 will be triggered after jobs 1, 2 and 3 complete

build("job4")

Is it possible to delegate a specific node for each job on the parallel 
environment?

--
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to 
[email protected]<mailto:[email protected]>.
For more options, visit https://groups.google.com/d/optout.

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to