Hi!
I have a problem and I'm looking for a direct solution (if possible) or a
workaround.

I have 2 jobs on Jenkins: job A (the upstream job) and job B (the downstream
job) that needs to be triggered after job A has finished (will be triggered
anyway, regardless of job A final status)

I used to solve this problem with: "configuring Trigger parameterized build
on other projects" set on job A and it worked perfectly fine.

The thing is, I have been told that I can not do any change to job A
configuation so I need to stop using the "configuring Trigger parameterized
build on other projects" from job A (which I added in the past). Is there a
way to configure something in job B that will trigger the job once job A is
done? I noticed there is an "Build after other projects are built" but
when checking this box, job B never started. In addition, in this way I
cannot move parameters from job A to job B like I did before...

Is there any other way (plugin or something else) that can help me define
everything in job B?

Thanks! Amit

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to