Hi! I have a problem and I'm looking for a direct solution (if possible) or a workaround.
I have 2 jobs on Jenkins: job A (the upstream job) and job B (the downstream job) that needs to be triggered after job A has finished (will be triggered anyway, regardless of job A final status) I used to solve this problem with: "configuring Trigger parameterized build on other projects" set on job A and it worked perfectly fine. The thing is, I have been told that I can not do any change to job A configuation so I need to stop using the "configuring Trigger parameterized build on other projects" from job A (which I added in the past). Is there a way to configure something in job B that will trigger the job once job A is done? I noticed there is an "Build after other projects are built" but when checking this box, job B never started. In addition, in this way I cannot move parameters from job A to job B like I did before... Is there any other way (plugin or something else) that can help me define everything in job B? Thanks! Amit -- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
