Hi,

I have maven incremental job with SCM ( perforce ).

The incremental option check the SCM changes and based on it choose which 
maven module to run.

Sometimes I need to manually sync the perforce workspace in order to skip 
the maven module build.

But when I do it in correct perforce workspace and trigger the job jenkins 
still see that my manually sync as job changes.

How I can do it?

Thanks

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/jenkinsci-users/47319a46-fa60-4194-b109-03759d113a5f%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to