Hi All,
I'm looking to use the Heavy Job Plugin so I can run a job on multiple nodes (with different number of executors) without having to deal other potential job running on the same node at the same time. Is there a way to add a 'max' value for 'Job Weigh', which would be equal to the number of executors of the node executing the job? Or is there a way to pass a parameter to it? (I've tried with String parameter, it doesn't work). Thanks -- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/jenkinsci-users/481a5d70-4446-48cd-953d-cb172f3daae7%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.
