Hi All,


I'm looking to use the Heavy Job Plugin so I can run a job on multiple 
nodes (with different number of executors) without having to deal other 
potential job running on the same node at the same time.


Is there a way to add a 'max' value for 'Job Weigh', which would be equal 
to the number of executors of the node executing the job?


Or is there a way to pass a parameter to it? (I've tried with String 
parameter, it doesn't work).


Thanks

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/jenkinsci-users/481a5d70-4446-48cd-953d-cb172f3daae7%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to