FiaDiabio-Tambura and Diabio-Ezo Roads Inaugurated in Western
Equatoria State’s Food Corridor
Article Comments (0)  Email PrintSave
--------------------------------------------------------------------------------

USAID
FiaDiabio-Tambura and Diabio-Ezo Roads Inaugurated in Western
Equatoria State’s Food Corridor

JUBA—On June 13, 2011, U.S. Consul General in Juba Ambassador R.
Barrie Walkley and USAID Mission Director William Hammink will join
Western Equatoria State Governor Colonel Joseph Bangasi Bakosoro, and
other senior Government of Southern Sudan officials at Tambura, to
witness the completion of construction and official inauguration of
the Diabio-Tambura Road (105 kms) and Diabio-Ezo Road (77 kms).
Together with the Yambio-Diabio road section, these are the first
engineered all-weather gravel roads in Western Equatoria State.

The roads are fully funded by USAID at a total cost of $37 million.
They represent the longstanding partnership between USAID and the
Ministry of Transport and Roads, as well as with Western Equatoria
State.

The Yambio-Tambura and Diabio-Ezo road segments are part of the
USAID-funded roads program that extends from the Yambio roundabout to
the town of Tambura in Western Equatoria State, for a total length of
185 km. It also includes emergency repairs from Diabio Junction to Ezo
town (77 kms).

In addition to road construction, the project has opportunities for
local roads contractors. The main construction contractors for these
roads were EYAT, PAYII, Rhino Stars, Gbudue, and CIVICON. Four of
these five contractors are Sudanese firms, and the other, CIVICON, is
a Kenyan contractor that has been operating in southern Sudan since
before the Comprehensive Peace Agreement was signed in 2005.

Western Equatoria State, known as the bread basket of southern Sudan,
is rebuilding its agricultural capacity as southern Sudan continues to
recover from decades of war. Small-scale farmers now sell surplus
produce in the local markets.

Because of USAID-funded road improvements, travel time from Yambio to
Diabio (80 km) has been reduced from more than 4 hours in October 2007
to 1.5 hours currently. This has improved supply of goods and services
and overall development of the area. Employment and business
opportunities for Sudanese nationals have also increased, with more
than 500,000 residents benefiting directly or indirectly as a result
of these roads. Ezo can now be reached in 3 to 4 hours from Yambio,
and Tambura can be reached in approximately 4 hours from Yambio.

These efforts are part of a broader array of nearly $300 million in US
Government road infrastructure assistance that includes the 192
kilometer-long Juba to Nimule Road, the first major paved road in
southern Sudan, as well as the Bandame Bridge in Central Equatoria
State; and emergency repairs to the 100 kilometer-long Pagak-Mathiang
Road in Upper Nile State.

In addition, 30 local contractors have been trained and gained work
experience through USAID’s road programs, which will contribute to
maintenance and sustainability of the roads.

-- 
You received this message because you are subscribed to the Google Groups "JFD 
info" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/jfdinfo?hl=en.

Reply via email to