DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUGĀ· RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT <http://issues.apache.org/bugzilla/show_bug.cgi?id=37155>. ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED ANDĀ· INSERTED IN THE BUG DATABASE.
http://issues.apache.org/bugzilla/show_bug.cgi?id=37155 ------- Additional Comments From [EMAIL PROTECTED] 2007-04-24 08:38 ------- (In reply to comment #0) > It should be possible to continue the execution of a testplan at that point > one > stopped it before. Some kind of "pause / resume" action should be available which would give some time to be sure things are done well. This time would let the user browse the already available results and decide if (s)he wants to go on with the testplan or abort the operation. <not_serious_mode> The impossibility of pausing the run makes JMeter act as a real-time RPG : if you're not fast enough, you're dead. Ok, I'll stop playing Starcraft :p </not_serious_mode> -- Configure bugmail: http://issues.apache.org/bugzilla/userprefs.cgi?tab=email ------- You are receiving this mail because: ------- You are the assignee for the bug, or are watching the assignee. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
