DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUGĀ· RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT <http://issues.apache.org/bugzilla/show_bug.cgi?id=42248>. ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED ANDĀ· INSERTED IN THE BUG DATABASE.
http://issues.apache.org/bugzilla/show_bug.cgi?id=42248 Summary: Need undo-redo support Product: JMeter Version: 2.2 Platform: All OS/Version: All Status: NEW Severity: enhancement Priority: P2 Component: Main AssignedTo: [email protected] ReportedBy: [EMAIL PROTECTED] Hi ! I am very happy with JMeter, which is very useful and powerful ! So, I decided to contribute in my way by pointing those little annoying things which the users had to put up with but didn't notice or didn't take the time to report. My thought are that a Undo/Redo feature is required while editing a test plan as it is well known that user _do_ mistakes and don't want to be punished simply for being human. At first, I would argue that adding such a framework to JMeter would imply some work, refactoring some things and implementing Command Pattern to ensure proper efficiency and power. When I think a little bit more about it, I feel it to be like an "internal XML patching system", as the problem is to apply modifications to the plan test tree (which can be represented as an XML tree) and add more modifications or revert some others. I hope this won't be too hard to implement in JMeter. I simply don't know as I've only _thought_ about it but not designed code to do it (which I am not able to write at this time). -- Configure bugmail: http://issues.apache.org/bugzilla/userprefs.cgi?tab=email ------- You are receiving this mail because: ------- You are the assignee for the bug, or are watching the assignee. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
