Author: sebb
Date: Thu Apr  3 15:55:21 2008
New Revision: 644548

URL: http://svn.apache.org/viewvc?rev=644548&view=rev
Log:
TPut Controller isn't ...

Modified:
    jakarta/jmeter/trunk/xdocs/usermanual/component_reference.xml

Modified: jakarta/jmeter/trunk/xdocs/usermanual/component_reference.xml
URL: 
http://svn.apache.org/viewvc/jakarta/jmeter/trunk/xdocs/usermanual/component_reference.xml?rev=644548&r1=644547&r2=644548&view=diff
==============================================================================
--- jakarta/jmeter/trunk/xdocs/usermanual/component_reference.xml (original)
+++ jakarta/jmeter/trunk/xdocs/usermanual/component_reference.xml Thu Apr  3 
15:55:21 2008
@@ -1394,6 +1394,10 @@
 
 <component name="Throughput Controller" index="&sect-num;.2.7"  width="223" 
height="148" screenshot="throughput_controller.png">
 <description>
+<p>
+<b>This controller is badly named, as it does not control throughput.</b>
+Please refer to the <complink name="Constant Throughput Timer"/> for an 
element that can be used to adjust the throughput.
+</p>
 <p>The Throughput Controller allows the user to control how often it is 
executed.  There are two modes - percent execution and total executions.  
Percent executions causes the controller to execute a certain percentage of the 
iterations through the test plan.  Total
 executions causes the controller to stop executing after a certain number of 
executions have occurred.  Like the Once Only Controller, this
 setting is reset when a parent Loop Controller restarts.



---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to