Hi Mabel!

How about telling the ThreadGroup to loop forever and using the Scheduler to
run for 2 hours? I haven't done this before, but my guess would be that
after two hours all threads would finish up and therefore do the desired
logout.

Not sure how you could do it if this doesn't help.

Carsten

-----Urspr�ngliche Nachricht-----
Von: Remedy QA [mailto:[EMAIL PROTECTED]
Gesendet: Mittwoch, 2. Juni 2004 19:02
An: JMeter Users List
Betreff: Re: AW: AW: how to run a logout transaction once


The following is the structure of your test plan that
you've included.

TestPlan
    ThreadGroup (loop once, no schedule)
        Loop Controller (loop 3 times)
            Simple Controller 1
                Once Only Controller
                    HTTP Request - login
            Simple Controller 2
                HTTP Request A
                    Constant Timer - 10 seconds
        HTTP Request - logout

I don't see how it controls running for 2 hours. How
do you tell the Loop Controller to run 2 hours? I'll
have to guess how many times it will loop in 2 hours?!
 Please elaborate. Thanks.

mabel

    
--- "Schlichting, Carsten (Z-EDV)"
<[EMAIL PROTECTED]> wrote:
> Sorry, I guess the attachment didn't make it through
> the firewall.
> 
> Here is the testplan I had attached. I was using
> JMeter 1.9.1:
> Let me know if this works for you.
> 
> Carsten
>  
....

> 
> -----Urspr�ngliche Nachricht-----
> Von: Remedy QA [mailto:[EMAIL PROTECTED]
> Gesendet: Donnerstag, 27. Mai 2004 18:26
> An: JMeter Users List
> Betreff: Re: AW: how to run a logout transaction
> once
> 
> 
> Would you just paste the code onto the email? I
> didn't get any attachment.
> Thanks!
> Actually, I haven't tried the Once Only Controller.
> From just reading the
> reference, I assume that is what it should do.  
> 
> "Schlichting, Carsten (Z-EDV)"
> <[EMAIL PROTECTED]> wrote:
> Hi!
> 
> Can you package everything you want to do during the
> 2 hours in one
> Controller and put your logout parallel to this
> controller? I have attached
> a sample plan that shows what I'm talking about ...
> 
> Carsten
> 
> P.S.: The only once controller always runs twice
> rather than once for me ...
> 
> -----Urspr�ngliche Nachricht-----
> Von: Remedy QA [mailto:[EMAIL PROTECTED]
> Gesendet: Mittwoch, 26. Mai 2004 18:48
> An: JMeter Users List
> Betreff: RE: how to run a logout transaction once
> 
> 
> The problem with this is that in Thread Group, it is
> scheduled to run for 2
> hours and loop forever. I am assuming that after 2
> hours, the looping will
> stop. 
> 
> So, according to your suggestion, Simple Controller
> for login and logout
> will repeat and that is not what I want. I can use
> Once Only Controller for
> login and the Loop Controller you suggested.
> However, the logout is the
> problem. I cannot use Once Only Controller for
> logout because the user
> should not logout until 2 hours has ended.
> 
> thanks.
> 
> "BAZLEY, Sebastian" wrote:
> Thread group
> Simple Controller
> Login
> Loop controller
> Random Controller
> Simple Controller
> Logout
> 
> Or something similar.
> -----Original Message-----
> From: Remedy QA [mailto:[EMAIL PROTECTED]
> Sent: 25 May 2004 20:14
> To: JMeter User List
> Subject: how to run a logout transaction once
> 
> 
> I would like to have users run these in this order
> in a scheduled simulation
> duration: 
> 1. a first set of transactions once, 
> 2. then run a second set randomly and repeatedly, 
> 3. then finally when simulation time is near the
> end, run a thrid set of
> transactions once. 
> 
> For the first 2 sets, I realize I can use the Once
> Only Controller and
> Random Controller respectively. However, I don't
> know how to get the last
> set to run only once at the time I want.
> 
> The last set of transactions is essentially logout.
> I would like the user
> to only login/logout once through the entire
> simulation. For the other
> transactions, I would like the users to repeat until
> the simulation time has
> ended. The final action should be logout before the
> simulation ends.
> 
> Can anyone think of a way to achieve this?
> 
> Thanks,
> Mabel
 



        
                
__________________________________
Do you Yahoo!?
Friends.  Fun.  Try the all-new Yahoo! Messenger.
http://messenger.yahoo.com/ 

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to