Has anyone else experienced the duration element in the scheduler being very 
inaccurate?  Example, I have a plan with one threadgroup that started at a specific 
time and with a duration of 3600 seconds (one hour).  The test ended normally, but 
only 28 actual minutes elapsed. The scheduler appears to start accurately based on my 
system's clock.  But the duration element appears not use the system clock and it 
seems to be using its own inaccurate mechanism. I have official version 2.0.1

Here was my plan setup:
Threadgroup: Threads= 1, loopcount=1, rampup=1, Scheduler start time 2004/07/29 
10:00:00 duration: 3600
-once only controller
  -sample1
-loop controller: infinite
  -uniform random timer: 5000ms constant, 10000ms random
  -sample2
  -sample3

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to