> you can use multiple thread groups and control each one with a timer, though
> the timing is probably going to vary depending on how fast the server
> responds.
> 
> at best, jmeter will try to simulate peak load and lull load.
> 
> a simple way would be to create 10 thread groups and have some thread groups
> set to a longer interval.

Well, that would work. But my task is to reproduce the load as exactly
as possible. I thaught, the access log sampler could do this.


Christian

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to