On 21/08/2009, Ivan Ivankovic <[email protected]> wrote:
> Hi,
>
>  I am trying to implement the following test scenario in JMeter:
>
>  (100*TC01+200*TC02+200*TC03) , 100*TC01
>
>  Where TC01, TC02, TC03 are test cases, "+" sign means parallel execution and
>  "," means serial execution.
>
>  My first shot was to make 3 ThreadGroups to implement TC01, TC02, TC03 so
>  they can work in parallel, but I have a problem how to start another 100
>  threads to execute TC01 after all previous thread group are finished.
>
>  There is a way to execute Thread Group in serial manner but I need mixed
>  behaviour.
>
>  Is this possible with JMeter?

Use two different test plans, and run them consecutively, e.g.

jmeter -n -t parallel.jmx
jmeter -n -t serial.jmx

> Maybe I am taking wrong approach by
>  representing Test cases as Thread Groups?
>

A ThreadGroup groups threads that all process the same test plan.

However JMeter supports conditional execution so it may be possible to
combine different test scenarios in a single thread group. Depends on
how different the tests are and how much effort you want to put into
setting up the conditional behaviour.

>  --
>  Pozdrav,
>  Ivanko
>

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to