specify start time and duration (or if you specify end time then keep duration empty). Keep Delay empty(you can either have delay or start time).
>And do I need to check the check box Forever? The above only specifies the maximum interval. if your test actually finishes before the time , then jmeter will stop (or other cases like you configure a csv data set config to stop the thread). So yes , usually you will have the checkbox for forever (or specify a large enough number of iterations so that your test does take > 9 or 12 hours) regards deepak On Mon, Aug 1, 2011 at 8:01 AM, Shirish <[email protected]> wrote: > Hello Friends, > > I am working on Scheduler configurations and stuck with some issues... I > need to execute some set of thread groups with one user for a particular > time like 12 hrs. > What values should I need to set for below fields to get Thread Groups > executed starting at 1 p.m. and stopping at 10 p.m. exactly Start Up delay > with 10secs. > > Start Time: > > End Time: > > Duration: > > Delay: > > And do I need to check the check box Forever? > > Please suggest as the way I am setting is not working as required. > Thanks, > Shirish G. >

