specify start time and duration (or if you specify end time then keep
duration empty). Keep Delay empty(you can either have delay or start time).

>And do I need to check the check box Forever?
The above only specifies the maximum interval. if your test actually
finishes before the time , then jmeter will stop (or other cases like you
configure a csv data set config to stop the thread). So yes , usually you
will have the checkbox for forever (or  specify a large enough number of
iterations so that your test does take > 9 or 12 hours)

regards
deepak


On Mon, Aug 1, 2011 at 8:01 AM, Shirish <[email protected]> wrote:

> Hello Friends,
>
> I am working on Scheduler configurations and stuck with some issues... I
> need to execute some set of thread groups with one user for a particular
> time like 12 hrs.
> What values should I need to set for below fields to get Thread Groups
> executed starting at 1 p.m. and stopping at 10 p.m. exactly Start Up delay
> with 10secs.
>
> Start Time:
>
> End Time:
>
> Duration:
>
> Delay:
>
> And do I need to check the check box Forever?
>
> Please suggest as the way I am setting is not working as required.
> Thanks,
> Shirish G.
>

Reply via email to