Note: This email is not intended to be a solicitation.  Please accept our
apologies and reply in the subject heading with REMOVE to be removed from
our Mailing list.

Excellent Business Analyst with Energy Client  Exp, local to TX is available
immediately.  Please forward your requirements to

*[email protected]* <[email protected]>* / 916-646-2080 x 212*

* *

*Consultant Name: Ripan=====With Oil & GAS Exp*

*Available: Two weeks *

*Skill Set: Business Analyst *

*Status: Own H1 *

*Consultant Contact Cell: 916-646-2080 x 212*

*Current Location: Texas *

*Preferred Location: Open *

*Professional Summary:*

·            *7+ Years* of diversified Experience in *Business Requirement
gathering, Business Process flows. *

·            *3+years *of extensive experience in* Information Management
(IM*), *Document Management System (DMS),* planning in Oil and Gas Giants
and Process Company.

·            Played a major role in analysis and applying /developing key
modules of an *ERP **application*

·            Development of Information* Management (IM)* procedures on
document numbering, document review and control, data and document handover
guidelines, vendor document requirement guidelines and implemented and
governed usage of *Document Management System.*

·            Experience in performing *Data Migration, Data Management
Services, feasibility analysis, risk analysis* and Gap analysis and managing
Information.

·            Web Content Management and *Enterprise Document
Management*systems to support company's Document and Data management

·            Proficient in analyzing and creating Use Cases, *Use Case
Diagrams, Data Flow Diagrams, Activity diagrams*, Class diagrams and
Sequence diagrams using MS Visio.

·            Expertise in defining scope of projects based on after
gathering Business Requirements including Documentation of constraints,
assumptions, business impacts, Project risks & scope exclusions.

·            Involved in *design architecture and database design *as well
as prototyping.

·            Involved in creating efficient procedures for Engineering Data
loading to *Life* *cycle Server (LCS-data warehouse*).

·            Map business processes to *ERP *system functionality and
establish configuration settings and rationale within the *Production
Planning, Inventory Management, Logistics and Finance business areas.*

·            Documentation of technical study, which includes Software
Requirement Specification, scope Documents, Business use cases, and system
use cases by using *CMM level 3 methodology*.

·            Interacting with team members in fixing errors and *User
Acceptance Testing (UAT).*

·            Experienced in *Project Management/Co-ordination *and* Team
Leading*.

·            Expertise in Verbal and Written Communication. Excellent
analytical & problem solving skills. A team player with strong interpersonal
and communication proficiency.

·            Considerable experience in a wide range of functions that
includes *Business process improvement, user support *and* communications.*



*Technical Skills:*

Eng. Software              :           Life Cycle Server (eWarehouse), *SAP-PM
Module*, Pro-E, *Auto Cad*
Smart Plant Instrumentation

Languages                   :           *C, C++, VB, XML*

Database                     :           Ms Access, Oracle, ADT-II (Shell
Specific)

MS Office                      :           Word, Excel, PowerPoint, Access,
Project, Visio

Operating System        :           Windows XP, Vista, MS DOS

DMS                             :           *Livelink, Share CAT*,
Documentum, AHA (Shell Specific)



*Professional Experience:*

*Chevron information Technology Company, Houston, TX
             (Jun '06—till date)*

*Sr. Information Management Analyst       *

*Agbami FPSO & Angola LNG*

*Description: Agbami *is* *one of the largest Floating Production and
storage offloading vessel located in Nigeria, which is having 2.15 mmbo Oil
Storage capacity, Offloading rate -45,000 boph*, Angola LNG *is LNG
gathering terminal in Angola*.*

*Responsibilities:*

·            Worked extensively with SME's in understanding, extracting,
refining and documenting the User and Business Requirements for data of the
project.**

·            Created easy procedures for Engineering Data loading to *Life*
*cycle Server (LCS-data warehouse*).

·            Standardizing data & documents with respect to LCS for data
loading

·            Developed data loading procedure for LCS for various projects

·            Provide documentation, user training and general support for
new and enhanced applications.

·            Created Use Case Scenarios and maintained the Use Cases (*Business
Use Cases, System Use Cases)* and modeled Use Case Diagrams, Activity
Diagrams, Business Flow Diagrams, Data Flow Diagrams, revised functional
specifications and other core materials throughout the SLC, making all
necessary revisions for defect correction and requirement clarification
/refinement.

·            Performed *Gap Analysis* for the modules in production,
conducted feasibility study and performed impact analysis for proposed
enhancements.

·            *Developing IM (Information Management)* procedures on data and
document handover guidelines, document numbering, document review and
control, vendor document requirement guidelines

·            Coordinated activities between business unit and technical
staff, developing new methods, policies, and procedures to meet the business
needs.

·            Conducted workflow, process diagram and Gap Analysis to derive
requirements for existing systems enhancements.

*Environment: Life Cycle Server, INTools, XML, Documentum, Oracle, MS Office
Suite, VB, MS Visio*


*KBR Inc, Houston, TX
     (May'05-May' 06)*

*Lead Information Management Analyst*

*Bangka***

*The Bangka Project is a *deepwater subsea tie-back of a gas field located
in the Rapak PSC, offshore East Kalimantan, Indonesia, in 3,200' of water.
Bangka is in CPDEP Phase 2. The field will be tied back to the existing West
Seno Floating Production Unit (FPU), which is located in the Makassar Strait
PSC.* *

*Responsibilities:*

·            Developed *IM strategies for ERP package* for Major Pipeline
projects of Shell.

·            Served as an interface with the Operations and Asset teams (end
Customers), Project Contractor and Supplier. Developed strategies to ensure
seamless information handover to operations.

·            Implemented *Engineering Information Specification (EIS)* and
implemented *Corporate* *Maintenance's CMMS guidelines*.

·            Developed IM procedures on document numbering, document review
and control, data and document handover guidelines, vendor document
requirement guidelines and implemented and governed usage of Livelink for
team collaboration and project documents.

·            Acted as a liaison between potential system users who have a
business problem and technology people who know how to create automated
solutions.

·            Drawing the schematics for use case diagrams, sequence
diagrams, collaboration diagrams to define system interactivity and specify
functional and technical requirements using *UML and MS Visio.*

·            Followed a structured approach to organize requirements into
logical groupings of essential business processes, business rules, and
information needs, and insures that critical requirements are not missed.

·            Finalization of Document Master List (DML),*Project Master Tag
List (MTL)*, Asset Classification and Identification

·            Coordinate and prioritize outstanding defects and
enhancement/system requests based on business requirements, allowing
sufficient time frame to ensure accuracy and consider deadlines.

*Environment: Livelink, Asset hierarchy Architecture, MS Office suite, MS
Project, MS Visio, PL/SQL,SAP-PM, INtools, AutoCAD, Oracle*


----------------------------------------------------------------------------------------------------------------------------------------------------

Regards,

John

|| Phone: 916 646 2080 Ext 212 || Fax:  916 646 2081 || Email:
[email protected] || Website: www.key-soft.com ||

Note: This email is not intended to be a solicitation.  Please accept our
apologies and reply in the subject heading with REMOVE to be removed from
our Mailing list.

--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"jobinusa" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/jobinusa?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to