Hi everybody, we´ve got an M320 with 4 power modules, a single routing engine and the following FPC´s:
1 FPC type 1 (with 2xGigE) 1 FPC type 2 (with 3xOC-48) 1 FPC type 3 (with 2x10GE) During a maintenance, we had to turn off only 2 power modules, but unfortunately the whole box went down ... According to docs, I was expecting the router to stay up and running, once this is not a fully "loaded" router (without lots of FPC type 3, for instance). What went wrong ? ;) Are there circumstances where I can turn off 2 power modules and M320 stay running? Regards -- Raniery Pontes :::::::::::::::::::::: [EMAIL PROTECTED] http://www.rnp.br/ceo/ _______________________________________________ juniper-nsp mailing list [email protected] https://puck.nether.net/mailman/listinfo/juniper-nsp

