I will have to try that one again. The only other issue would be if a customer had 2 links into the same aggregation switch ( which happens with Metro Ethernet more than not due to geographic location ). I would kill both uplinks from two different locations even though only one location had a fiber cut.
I had thought about running more than 1 uplink from the aggregation switch to the MX routers but that drives the cost per port up dramatically. That being said I won't throw that idea out of the mix. Thank you for the idea, I will test it and see if it would work at least for some of the scenario's we have in the field. Matt -----Original Message----- From: Peter Krupl [mailto:[email protected]] Sent: Tuesday, March 13, 2012 10:11 AM To: Haynes, Matthew Subject: RE: Design issue when dual homing customer edge equipment to 2 different pop locations Hi, I have looked at CFM for exactly this scenario, and it seemed to work as expected. However I did not verify if the mac table was flushed. But you can absolutely use CFM on a subinterface. Med venlig hilsen Peter Krupl Netværksspecialist Operations Development Kundeservice +45 7026 2300 Fax +45 7026 2301 Siminn Danmark A/S Stationsparken 25 . 2600 Glostrup . Danmark . siminn.dk > -----Original Message----- > From: [email protected] [mailto:juniper-nsp- > [email protected]] On Behalf Of Haynes, Matthew > Sent: 12. marts 2012 20:50 > To: [email protected] > Subject: [j-nsp] Design issue when dual homing customer edge equipment to > 2 different pop locations > > Hi All, > > What I'm facing is an issue getting a vpls mac table to flush. > > Our typical design with a protected ethernet service would be a customer > edge device ( or devices ) with dual fiber connections up to two separate pop > locations. The pop's themselves always have an aggregation switch with > 10Gbps link ( or links depending on bandwidth etc ) up to a MX router. The > MX uses vpls to carry the ethernet service across the mpls core and out to > the other end of the customer circuit. The vpls circuit is tied to a logical > unit > on the MX's 10Gbps interface. This would be a single vlan/evc handoff to the > customer. ( I have a visio diagram and a jpg image of the design but I can't > post to the thread with the attachment on the email ) > > The problem I'm facing is with vpls mac flushing. If I lose a link between the > customer edge device and the aggregation switch, the vpls mac tables don't > know to flush on the MX routers causing it not to fail over in a timely > fashion. > > What I've attempted to get working in the lab is as follows. > > MSTP on the MX router is physical interface based, this is due to several > customers riding the same physical 10G link from the aggregation switch up > to the MX itself. > > ERP won't work due to version/compatibility issues between the MX and any > aggregation switch and or CPE we currently use. > > 802.1ag / CFM won't work because it's also tied to the physical interface and > I > cannot knock down the entire 10G link between the aggregation switch and > the MX due to other customer traffic across the same link. Also, tying this to > the VPLS session won't work since a lot of the time there is another circuit > from the same customer homed into the aggregation switch. If I knock down > the whole vpls session anything homed to that particular pop for that > customer goes down. ( if I'm not thinking of something with this technology > please let me know ) > > Any and all suggestions are certainly appreciated and I look forward to > hearing other possible solutions. If I've missed anything when using the > above technologies please let me know. > > Thanks to all of you in advance. > > Matt > > > > _______________________________________________ > juniper-nsp mailing list [email protected] > https://puck.nether.net/mailman/listinfo/juniper-nsp _______________________________________________ juniper-nsp mailing list [email protected] https://puck.nether.net/mailman/listinfo/juniper-nsp