Hello,

i  hope this is the correct mailing list.

I have the following problem with the following scenario:

Core Switch -> Access Switch connected with an uplink port, this should be 
turned off in a Layer 2 Loop.
(Customer switch for example) - if a configuration error happens from the 
customer side.
I have to test 3 switches, which are connected with RSTP. (All the same 
firmware, the "Core Switch" is configured with RSTP, the "Customer Switches" 
are unconfigured.) Ports are not turned off in a produced loop (physically), 
think this is because the Juniper switches are smart enough to know that a real 
loop does not exists, Edge Prots are out of the question because the ports are 
switched off to the customer switch directly (which is normal).
Probably anyone have a solution?
When the core switch is connected to the customer switch, but the customer 
connects his unconfigured switch or has a configuration error that can not 
create a loop?

Thanks for your time & help.

Simon.
 
_______________________________________________
juniper-nsp mailing list [email protected]
https://puck.nether.net/mailman/listinfo/juniper-nsp

Reply via email to