Hello, i hope this is the correct mailing list.
I have the following problem with the following scenario: Core Switch -> Access Switch connected with an uplink port, this should be turned off in a Layer 2 Loop. (Customer switch for example) - if a configuration error happens from the customer side. I have to test 3 switches, which are connected with RSTP. (All the same firmware, the "Core Switch" is configured with RSTP, the "Customer Switches" are unconfigured.) Ports are not turned off in a produced loop (physically), think this is because the Juniper switches are smart enough to know that a real loop does not exists, Edge Prots are out of the question because the ports are switched off to the customer switch directly (which is normal). Probably anyone have a solution? When the core switch is connected to the customer switch, but the customer connects his unconfigured switch or has a configuration error that can not create a loop? Thanks for your time & help. Simon. _______________________________________________ juniper-nsp mailing list [email protected] https://puck.nether.net/mailman/listinfo/juniper-nsp

