https://bugs.kde.org/show_bug.cgi?id=236672

Helge Kreutzmann <[email protected]> changed:

           What    |Removed                     |Added
----------------------------------------------------------------------------
                 CC|                            |[email protected]

--- Comment #10 from Helge Kreutzmann <[email protected]> ---
I haven't burned for ages, but now I'm running in the same problem. I'm on
Debian stable atm.

If I create an iso image and burn this (as root), this works. The error message
in k3b says:

The error message says:
cdrecord has no permissions to open the device
Modify device settings in K3b to solve this problem.

However, I cannot find any "device settings" in K3b where i could change
permissions.
I'm member of the group "cdrom" and the permissions look right:

brw-rw----+ 1 root cdrom 11, 0 14. Feb 14:29 /dev/sr0

The k3b log says:
Devices
-----------------------
HL-DT-ST DVDRAM GH24NSD5 LV00 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R,
DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL) [DVD-ROM, DVD-R Sequential, DVD-R
Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted
Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R,
CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R,
Restricted Overwrite, Layer Jump] [%7]

K3b::IsoImager
-----------------------
mkisofs print size result: 357295 (731740160 bytes)

System
-----------------------
K3b Version: 25.4.0
KDE Version: 6.13.0
Qt Version:  6.8.2
Kernel:      6.12.70

Used versions
-----------------------
mkisofs: 1.1.11
cdrecord: 1.1.11

cdrecord
-----------------------
/usr/bin/wodim: Operation not permitted. Warning: Cannot raise RLIMIT_MEMLOCK
limits.
/usr/bin/wodim: Resource temporarily unavailable. Cannot get mmap for 12587008
Bytes on /dev/zero.
TOC Type: 1 = CD-ROM

cdrecord command:
-----------------------
/usr/bin/wodim -v gracetime=2 dev=/dev/sr0 speed=48 -sao driveropts=burnfree
-data -tsize=357295s -

mkisofs
-----------------------
357295
  0.14% done, estimate finish Sat Feb 14 14:29:46 2026
  0.28% done, estimate finish Sat Feb 14 14:29:46 2026
  0.42% done, estimate finish Sat Feb 14 14:29:46 2026
  0.56% done, estimate finish Sat Feb 14 14:29:46 2026
  0.70% done, estimate finish Sat Feb 14 14:29:46 2026
  0.84% done, estimate finish Sat Feb 14 14:29:46 2026
  0.98% done, estimate finish Sat Feb 14 14:29:46 2026
  1.12% done, estimate finish Sat Feb 14 14:29:46 2026
  1.26% done, estimate finish Sat Feb 14 14:29:46 2026
  1.40% done, estimate finish Sat Feb 14 14:29:46 2026
  1.54% done, estimate finish Sat Feb 14 14:29:46 2026
  1.68% done, estimate finish Sat Feb 14 14:29:46 2026
  1.82% done, estimate finish Sat Feb 14 14:29:46 2026
  1.96% done, estimate finish Sat Feb 14 14:29:46 2026
  2.10% done, estimate finish Sat Feb 14 14:29:46 2026
  2.24% done, estimate finish Sat Feb 14 14:29:46 2026
  2.38% done, estimate finish Sat Feb 14 14:29:46 2026
  2.52% done, estimate finish Sat Feb 14 14:29:46 2026
  2.66% done, estimate finish Sat Feb 14 14:29:46 2026
  2.80% done, estimate finish Sat Feb 14 14:29:46 2026
  2.94% done, estimate finish Sat Feb 14 14:29:46 2026
  3.08% done, estimate finish Sat Feb 14 14:29:46 2026
  3.22% done, estimate finish Sat Feb 14 14:29:46 2026
  3.36% done, estimate finish Sat Feb 14 14:29:46 2026
  3.50% done, estimate finish Sat Feb 14 14:29:46 2026
  3.64% done, estimate finish Sat Feb 14 14:29:46 2026
  3.78% done, estimate finish Sat Feb 14 14:29:46 2026
  3.92% done, estimate finish Sat Feb 14 14:29:46 2026
  4.06% done, estimate finish Sat Feb 14 14:29:46 2026
  4.20% done, estimate finish Sat Feb 14 14:29:46 2026
  4.34% done, estimate finish Sat Feb 14 14:29:46 2026
  4.48% done, estimate finish Sat Feb 14 14:29:46 2026
  4.62% done, estimate finish Sat Feb 14 14:29:46 2026
  4.76% done, estimate finish Sat Feb 14 14:29:46 2026
  4.90% done, estimate finish Sat Feb 14 14:29:46 2026
  5.04% done, estimate finish Sat Feb 14 14:29:46 2026
  5.18% done, estimate finish Sat Feb 14 14:29:46 2026
  5.32% done, estimate finish Sat Feb 14 14:29:46 2026
  5.46% done, estimate finish Sat Feb 14 14:29:46 2026
  5.60% done, estimate finish Sat Feb 14 14:29:46 2026
  5.74% done, estimate finish Sat Feb 14 14:29:46 2026
  5.88% done, estimate finish Sat Feb 14 14:29:46 2026
  6.02% done, estimate finish Sat Feb 14 14:29:46 2026
  6.16% done, estimate finish Sat Feb 14 14:29:46 2026
  6.30% done, estimate finish Sat Feb 14 14:29:46 2026
  6.44% done, estimate finish Sat Feb 14 14:29:46 2026
  6.58% done, estimate finish Sat Feb 14 14:29:46 2026
  6.72% done, estimate finish Sat Feb 14 14:29:46 2026
  6.86% done, estimate finish Sat Feb 14 14:29:46 2026
  7.00% done, estimate finish Sat Feb 14 14:29:46 2026
  7.14% done, estimate finish Sat Feb 14 14:29:46 2026
  7.28% done, estimate finish Sat Feb 14 14:29:46 2026
  7.42% done, estimate finish Sat Feb 14 14:29:46 2026
  7.56% done, estimate finish Sat Feb 14 14:29:46 2026
  7.70% done, estimate finish Sat Feb 14 14:29:46 2026
  7.84% done, estimate finish Sat Feb 14 14:29:46 2026
  7.98% done, estimate finish Sat Feb 14 14:29:46 2026
  8.12% done, estimate finish Sat Feb 14 14:29:46 2026
  8.26% done, estimate finish Sat Feb 14 14:29:46 2026
  8.40% done, estimate finish Sat Feb 14 14:29:46 2026
  8.54% done, estimate finish Sat Feb 14 14:29:46 2026
  8.68% done, estimate finish Sat Feb 14 14:29:46 2026
  8.82% done, estimate finish Sat Feb 14 14:29:46 2026
  8.96% done, estimate finish Sat Feb 14 14:29:46 2026
  9.10% done, estimate finish Sat Feb 14 14:29:46 2026
  9.24% done, estimate finish Sat Feb 14 14:29:46 2026
  9.38% done, estimate finish Sat Feb 14 14:29:46 2026
  9.52% done, estimate finish Sat Feb 14 14:29:46 2026
  9.66% done, estimate finish Sat Feb 14 14:29:46 2026
  9.80% done, estimate finish Sat Feb 14 14:29:46 2026
  9.94% done, estimate finish Sat Feb 14 14:29:46 2026
 10.08% done, estimate finish Sat Feb 14 14:29:46 2026
 10.22% done, estimate finish Sat Feb 14 14:29:46 2026
 10.36% done, estimate finish Sat Feb 14 14:29:46 2026
 10.50% done, estimate finish Sat Feb 14 14:29:46 2026
 10.64% done, estimate finish Sat Feb 14 14:29:46 2026
 10.78% done, estimate finish Sat Feb 14 14:29:46 2026
 10.92% done, estimate finish Sat Feb 14 14:29:46 2026
 11.06% done, estimate finish Sat Feb 14 14:29:46 2026
 11.20% done, estimate finish Sat Feb 14 14:29:46 2026
 11.34% done, estimate finish Sat Feb 14 14:29:46 2026
 11.48% done, estimate finish Sat Feb 14 14:29:46 2026
 11.62% done, estimate finish Sat Feb 14 14:29:46 2026
 11.76% done, estimate finish Sat Feb 14 14:29:46 2026
 11.90% done, estimate finish Sat Feb 14 14:29:46 2026
 12.04% done, estimate finish Sat Feb 14 14:29:46 2026
 12.18% done, estimate finish Sat Feb 14 14:29:46 2026
 12.32% done, estimate finish Sat Feb 14 14:29:46 2026
 12.46% done, estimate finish Sat Feb 14 14:29:46 2026
 12.60% done, estimate finish Sat Feb 14 14:29:46 2026
 12.74% done, estimate finish Sat Feb 14 14:29:46 2026
 12.87% done, estimate finish Sat Feb 14 14:29:46 2026
 13.02% done, estimate finish Sat Feb 14 14:29:46 2026
 13.16% done, estimate finish Sat Feb 14 14:29:46 2026
 13.30% done, estimate finish Sat Feb 14 14:29:46 2026
 13.43% done, estimate finish Sat Feb 14 14:29:46 2026
 13.58% done, estimate finish Sat Feb 14 14:29:46 2026
 13.72% done, estimate finish Sat Feb 14 14:29:46 2026
 13.86% done, estimate finish Sat Feb 14 14:29:46 2026
 13.99% done, estimate finish Sat Feb 14 14:29:46 2026
 14.14% done, estimate finish Sat Feb 14 14:29:46 2026
 14.28% done, estimate finish Sat Feb 14 14:29:46 2026
 14.42% done, estimate finish Sat Feb 14 14:29:46 2026
 14.55% done, estimate finish Sat Feb 14 14:29:46 2026
 14.70% done, estimate finish Sat Feb 14 14:29:46 2026
 14.84% done, estimate finish Sat Feb 14 14:29:46 2026
 14.98% done, estimate finish Sat Feb 14 14:29:46 2026
 15.11% done, estimate finish Sat Feb 14 14:29:46 2026
 15.26% done, estimate finish Sat Feb 14 14:29:46 2026
 15.40% done, estimate finish Sat Feb 14 14:29:46 2026
 15.53% done, estimate finish Sat Feb 14 14:29:46 2026
 15.67% done, estimate finish Sat Feb 14 14:29:46 2026
 15.82% done, estimate finish Sat Feb 14 14:29:46 2026
 15.96% done, estimate finish Sat Feb 14 14:29:46 2026
 16.09% done, estimate finish Sat Feb 14 14:29:46 2026
 16.23% done, estimate finish Sat Feb 14 14:29:46 2026
 16.38% done, estimate finish Sat Feb 14 14:29:46 2026
 16.52% done, estimate finish Sat Feb 14 14:29:46 2026
 16.65% done, estimate finish Sat Feb 14 14:29:46 2026
 16.79% done, estimate finish Sat Feb 14 14:29:46 2026
 16.94% done, estimate finish Sat Feb 14 14:29:46 2026
 17.08% done, estimate finish Sat Feb 14 14:29:46 2026
 17.21% done, estimate finish Sat Feb 14 14:29:46 2026
 17.35% done, estimate finish Sat Feb 14 14:29:46 2026
 17.50% done, estimate finish Sat Feb 14 14:29:46 2026
 17.64% done, estimate finish Sat Feb 14 14:29:46 2026
 17.77% done, estimate finish Sat Feb 14 14:29:46 2026
 17.91% done, estimate finish Sat Feb 14 14:29:46 2026
 18.06% done, estimate finish Sat Feb 14 14:29:46 2026
 18.19% done, estimate finish Sat Feb 14 14:29:46 2026
 18.33% done, estimate finish Sat Feb 14 14:29:46 2026
 18.47% done, estimate finish Sat Feb 14 14:29:46 2026
 18.62% done, estimate finish Sat Feb 14 14:29:46 2026
 18.75% done, estimate finish Sat Feb 14 14:29:46 2026
 18.89% done, estimate finish Sat Feb 14 14:29:46 2026
 19.03% done, estimate finish Sat Feb 14 14:29:46 2026
 19.18% done, estimate finish Sat Feb 14 14:29:46 2026
 19.31% done, estimate finish Sat Feb 14 14:29:46 2026
 19.45% done, estimate finish Sat Feb 14 14:29:46 2026
 19.59% done, estimate finish Sat Feb 14 14:29:46 2026
 19.74% done, estimate finish Sat Feb 14 14:29:46 2026
 19.87% done, estimate finish Sat Feb 14 14:29:46 2026
 20.01% done, estimate finish Sat Feb 14 14:29:46 2026
 20.15% done, estimate finish Sat Feb 14 14:29:46 2026
 20.29% done, estimate finish Sat Feb 14 14:29:46 2026
 20.43% done, estimate finish Sat Feb 14 14:29:46 2026
 20.57% done, estimate finish Sat Feb 14 14:29:46 2026
 20.71% done, estimate finish Sat Feb 14 14:29:46 2026
 20.85% done, estimate finish Sat Feb 14 14:29:46 2026
 20.99% done, estimate finish Sat Feb 14 14:29:46 2026
 21.13% done, estimate finish Sat Feb 14 14:29:46 2026
 21.27% done, estimate finish Sat Feb 14 14:29:46 2026
 21.41% done, estimate finish Sat Feb 14 14:29:46 2026
 21.55% done, estimate finish Sat Feb 14 14:29:46 2026
 21.69% done, estimate finish Sat Feb 14 14:29:46 2026
 21.83% done, estimate finish Sat Feb 14 14:29:46 2026
 21.97% done, estimate finish Sat Feb 14 14:29:46 2026
 22.11% done, estimate finish Sat Feb 14 14:29:46 2026
 22.25% done, estimate finish Sat Feb 14 14:29:46 2026
 22.39% done, estimate finish Sat Feb 14 14:29:46 2026
 22.53% done, estimate finish Sat Feb 14 14:29:46 2026
 22.67% done, estimate finish Sat Feb 14 14:29:46 2026
 22.81% done, estimate finish Sat Feb 14 14:29:46 2026
 22.95% done, estimate finish Sat Feb 14 14:29:46 2026
 23.09% done, estimate finish Sat Feb 14 14:29:46 2026
 23.23% done, estimate finish Sat Feb 14 14:29:46 2026
 23.37% done, estimate finish Sat Feb 14 14:29:46 2026
 23.51% done, estimate finish Sat Feb 14 14:29:46 2026
 23.65% done, estimate finish Sat Feb 14 14:29:46 2026
 23.79% done, estimate finish Sat Feb 14 14:29:46 2026
 23.93% done, estimate finish Sat Feb 14 14:29:46 2026
 24.07% done, estimate finish Sat Feb 14 14:29:46 2026
 24.21% done, estimate finish Sat Feb 14 14:29:46 2026
 24.35% done, estimate finish Sat Feb 14 14:29:46 2026
 24.49% done, estimate finish Sat Feb 14 14:29:46 2026
 24.63% done, estimate finish Sat Feb 14 14:29:46 2026
 24.77% done, estimate finish Sat Feb 14 14:29:46 2026
 24.91% done, estimate finish Sat Feb 14 14:29:46 2026
 25.05% done, estimate finish Sat Feb 14 14:29:46 2026
 25.19% done, estimate finish Sat Feb 14 14:29:46 2026
 25.33% done, estimate finish Sat Feb 14 14:29:46 2026
 25.47% done, estimate finish Sat Feb 14 14:29:46 2026
 25.61% done, estimate finish Sat Feb 14 14:29:46 2026
 25.75% done, estimate finish Sat Feb 14 14:29:46 2026
 25.89% done, estimate finish Sat Feb 14 14:29:46 2026
 26.03% done, estimate finish Sat Feb 14 14:29:46 2026
 26.17% done, estimate finish Sat Feb 14 14:29:46 2026
 26.31% done, estimate finish Sat Feb 14 14:29:46 2026
 26.45% done, estimate finish Sat Feb 14 14:29:46 2026
 26.59% done, estimate finish Sat Feb 14 14:29:46 2026
 26.73% done, estimate finish Sat Feb 14 14:29:46 2026
 26.87% done, estimate finish Sat Feb 14 14:29:46 2026
 27.01% done, estimate finish Sat Feb 14 14:29:46 2026
 27.15% done, estimate finish Sat Feb 14 14:29:46 2026
 27.29% done, estimate finish Sat Feb 14 14:29:46 2026
 27.43% done, estimate finish Sat Feb 14 14:29:46 2026
 27.57% done, estimate finish Sat Feb 14 14:29:46 2026
 27.71% done, estimate finish Sat Feb 14 14:29:46 2026
 27.85% done, estimate finish Sat Feb 14 14:29:46 2026
 27.99% done, estimate finish Sat Feb 14 14:29:46 2026
 28.13% done, estimate finish Sat Feb 14 14:29:46 2026
 28.27% done, estimate finish Sat Feb 14 14:29:46 2026
 28.41% done, estimate finish Sat Feb 14 14:29:46 2026
 28.55% done, estimate finish Sat Feb 14 14:29:46 2026
 28.69% done, estimate finish Sat Feb 14 14:29:46 2026
 28.83% done, estimate finish Sat Feb 14 14:29:46 2026
 28.97% done, estimate finish Sat Feb 14 14:29:46 2026
 29.11% done, estimate finish Sat Feb 14 14:29:46 2026
 29.25% done, estimate finish Sat Feb 14 14:29:46 2026
 29.39% done, estimate finish Sat Feb 14 14:29:46 2026
 29.53% done, estimate finish Sat Feb 14 14:29:46 2026
 29.67% done, estimate finish Sat Feb 14 14:29:46 2026
 29.81% done, estimate finish Sat Feb 14 14:29:46 2026
 29.95% done, estimate finish Sat Feb 14 14:29:46 2026
 30.09% done, estimate finish Sat Feb 14 14:29:46 2026
 30.23% done, estimate finish Sat Feb 14 14:29:46 2026
 30.37% done, estimate finish Sat Feb 14 14:29:46 2026
 30.51% done, estimate finish Sat Feb 14 14:29:46 2026
 30.65% done, estimate finish Sat Feb 14 14:29:46 2026
 30.79% done, estimate finish Sat Feb 14 14:29:46 2026
 30.93% done, estimate finish Sat Feb 14 14:29:46 2026
 31.07% done, estimate finish Sat Feb 14 14:29:46 2026
 31.21% done, estimate finish Sat Feb 14 14:29:46 2026
 31.35% done, estimate finish Sat Feb 14 14:29:46 2026
 31.49% done, estimate finish Sat Feb 14 14:29:46 2026
 31.63% done, estimate finish Sat Feb 14 14:29:46 2026
 31.77% done, estimate finish Sat Feb 14 14:29:46 2026
 31.91% done, estimate finish Sat Feb 14 14:29:46 2026
 32.05% done, estimate finish Sat Feb 14 14:29:46 2026
 32.19% done, estimate finish Sat Feb 14 14:29:46 2026
 32.33% done, estimate finish Sat Feb 14 14:29:46 2026
 32.47% done, estimate finish Sat Feb 14 14:29:46 2026
 32.61% done, estimate finish Sat Feb 14 14:29:46 2026
 32.75% done, estimate finish Sat Feb 14 14:29:46 2026
 32.89% done, estimate finish Sat Feb 14 14:29:46 2026
 33.03% done, estimate finish Sat Feb 14 14:29:46 2026
 33.17% done, estimate finish Sat Feb 14 14:29:46 2026
 33.31% done, estimate finish Sat Feb 14 14:29:46 2026
 33.45% done, estimate finish Sat Feb 14 14:29:46 2026
 33.59% done, estimate finish Sat Feb 14 14:29:46 2026
 33.73% done, estimate finish Sat Feb 14 14:29:46 2026
 33.87% done, estimate finish Sat Feb 14 14:29:46 2026
 34.01% done, estimate finish Sat Feb 14 14:29:46 2026
 34.15% done, estimate finish Sat Feb 14 14:29:46 2026
 34.29% done, estimate finish Sat Feb 14 14:29:46 2026
 34.43% done, estimate finish Sat Feb 14 14:29:46 2026
 34.57% done, estimate finish Sat Feb 14 14:29:46 2026
 34.71% done, estimate finish Sat Feb 14 14:29:46 2026
 34.85% done, estimate finish Sat Feb 14 14:29:46 2026
 34.99% done, estimate finish Sat Feb 14 14:29:46 2026
 35.13% done, estimate finish Sat Feb 14 14:29:46 2026
 35.27% done, estimate finish Sat Feb 14 14:29:46 2026
 35.41% done, estimate finish Sat Feb 14 14:29:46 2026
 35.55% done, estimate finish Sat Feb 14 14:29:46 2026
 35.69% done, estimate finish Sat Feb 14 14:29:46 2026
 35.83% done, estimate finish Sat Feb 14 14:29:46 2026
 35.97% done, estimate finish Sat Feb 14 14:29:46 2026
 36.11% done, estimate finish Sat Feb 14 14:29:46 2026
 36.25% done, estimate finish Sat Feb 14 14:29:46 2026
 36.38% done, estimate finish Sat Feb 14 14:29:46 2026
 36.53% done, estimate finish Sat Feb 14 14:29:46 2026
 36.67% done, estimate finish Sat Feb 14 14:29:46 2026
 36.81% done, estimate finish Sat Feb 14 14:29:46 2026
 36.94% done, estimate finish Sat Feb 14 14:29:46 2026
 37.09% done, estimate finish Sat Feb 14 14:29:46 2026
 37.23% done, estimate finish Sat Feb 14 14:29:46 2026
 37.37% done, estimate finish Sat Feb 14 14:29:46 2026
 37.50% done, estimate finish Sat Feb 14 14:29:46 2026
 37.65% done, estimate finish Sat Feb 14 14:29:46 2026
 37.79% done, estimate finish Sat Feb 14 14:29:46 2026
 37.93% done, estimate finish Sat Feb 14 14:29:46 2026
 38.06% done, estimate finish Sat Feb 14 14:29:46 2026
 38.21% done, estimate finish Sat Feb 14 14:29:46 2026
 38.35% done, estimate finish Sat Feb 14 14:29:46 2026
 38.49% done, estimate finish Sat Feb 14 14:29:46 2026
 38.62% done, estimate finish Sat Feb 14 14:29:46 2026
 38.77% done, estimate finish Sat Feb 14 14:29:46 2026
 38.91% done, estimate finish Sat Feb 14 14:29:46 2026
 39.04% done, estimate finish Sat Feb 14 14:29:46 2026
 39.18% done, estimate finish Sat Feb 14 14:29:46 2026
 39.33% done, estimate finish Sat Feb 14 14:29:46 2026
 39.47% done, estimate finish Sat Feb 14 14:29:46 2026
 39.60% done, estimate finish Sat Feb 14 14:29:46 2026
 39.74% done, estimate finish Sat Feb 14 14:29:46 2026
 39.89% done, estimate finish Sat Feb 14 14:29:46 2026
 40.03% done, estimate finish Sat Feb 14 14:29:46 2026
 40.16% done, estimate finish Sat Feb 14 14:29:46 2026
 40.30% done, estimate finish Sat Feb 14 14:29:46 2026
 40.45% done, estimate finish Sat Feb 14 14:29:46 2026
 40.59% done, estimate finish Sat Feb 14 14:29:46 2026
 40.72% done, estimate finish Sat Feb 14 14:29:46 2026
 40.86% done, estimate finish Sat Feb 14 14:29:46 2026
 41.01% done, estimate finish Sat Feb 14 14:29:46 2026
 41.14% done, estimate finish Sat Feb 14 14:29:46 2026
 41.28% done, estimate finish Sat Feb 14 14:29:46 2026
 41.42% done, estimate finish Sat Feb 14 14:29:46 2026
 41.57% done, estimate finish Sat Feb 14 14:29:46 2026
 41.70% done, estimate finish Sat Feb 14 14:29:46 2026
 41.84% done, estimate finish Sat Feb 14 14:29:46 2026
 41.98% done, estimate finish Sat Feb 14 14:29:46 2026
 42.13% done, estimate finish Sat Feb 14 14:29:46 2026
 42.26% done, estimate finish Sat Feb 14 14:29:46 2026
 42.40% done, estimate finish Sat Feb 14 14:29:46 2026
 42.54% done, estimate finish Sat Feb 14 14:29:46 2026
 42.69% done, estimate finish Sat Feb 14 14:29:46 2026
 42.82% done, estimate finish Sat Feb 14 14:29:46 2026
 42.96% done, estimate finish Sat Feb 14 14:29:46 2026
 43.10% done, estimate finish Sat Feb 14 14:29:46 2026
 43.25% done, estimate finish Sat Feb 14 14:29:46 2026
 43.38% done, estimate finish Sat Feb 14 14:29:46 2026
 43.52% done, estimate finish Sat Feb 14 14:29:46 2026
 43.66% done, estimate finish Sat Feb 14 14:29:46 2026
 43.80% done, estimate finish Sat Feb 14 14:29:46 2026
 43.94% done, estimate finish Sat Feb 14 14:29:46 2026
 44.08% done, estimate finish Sat Feb 14 14:29:46 2026
 44.22% done, estimate finish Sat Feb 14 14:29:48 2026
 44.36% done, estimate finish Sat Feb 14 14:29:48 2026
 44.50% done, estimate finish Sat Feb 14 14:29:48 2026
 44.64% done, estimate finish Sat Feb 14 14:29:48 2026
 44.78% done, estimate finish Sat Feb 14 14:29:48 2026
 44.92% done, estimate finish Sat Feb 14 14:29:48 2026
 45.06% done, estimate finish Sat Feb 14 14:29:48 2026
 45.20% done, estimate finish Sat Feb 14 14:29:48 2026
 45.34% done, estimate finish Sat Feb 14 14:29:48 2026
 45.48% done, estimate finish Sat Feb 14 14:29:48 2026
 45.62% done, estimate finish Sat Feb 14 14:29:48 2026
 45.76% done, estimate finish Sat Feb 14 14:29:48 2026
 45.90% done, estimate finish Sat Feb 14 14:29:48 2026
 46.04% done, estimate finish Sat Feb 14 14:29:48 2026
 46.18% done, estimate finish Sat Feb 14 14:29:48 2026
 46.32% done, estimate finish Sat Feb 14 14:29:48 2026
 46.46% done, estimate finish Sat Feb 14 14:29:48 2026
 46.60% done, estimate finish Sat Feb 14 14:29:48 2026
 46.74% done, estimate finish Sat Feb 14 14:29:48 2026
 46.88% done, estimate finish Sat Feb 14 14:29:48 2026
 47.02% done, estimate finish Sat Feb 14 14:29:48 2026
 47.16% done, estimate finish Sat Feb 14 14:29:48 2026
 47.30% done, estimate finish Sat Feb 14 14:29:48 2026
 47.44% done, estimate finish Sat Feb 14 14:29:48 2026
 47.58% done, estimate finish Sat Feb 14 14:29:48 2026
 47.72% done, estimate finish Sat Feb 14 14:29:48 2026
 47.86% done, estimate finish Sat Feb 14 14:29:48 2026
 48.00% done, estimate finish Sat Feb 14 14:29:48 2026
 48.14% done, estimate finish Sat Feb 14 14:29:48 2026
 48.28% done, estimate finish Sat Feb 14 14:29:48 2026
 48.42% done, estimate finish Sat Feb 14 14:29:48 2026
 48.56% done, estimate finish Sat Feb 14 14:29:48 2026
 48.70% done, estimate finish Sat Feb 14 14:29:48 2026
 48.84% done, estimate finish Sat Feb 14 14:29:48 2026
 48.98% done, estimate finish Sat Feb 14 14:29:48 2026
 49.12% done, estimate finish Sat Feb 14 14:29:48 2026
 49.26% done, estimate finish Sat Feb 14 14:29:48 2026
 49.40% done, estimate finish Sat Feb 14 14:29:48 2026
 49.54% done, estimate finish Sat Feb 14 14:29:48 2026
 49.68% done, estimate finish Sat Feb 14 14:29:48 2026
 49.82% done, estimate finish Sat Feb 14 14:29:48 2026
 49.96% done, estimate finish Sat Feb 14 14:29:48 2026
 50.10% done, estimate finish Sat Feb 14 14:29:47 2026
 50.24% done, estimate finish Sat Feb 14 14:29:47 2026
 50.38% done, estimate finish Sat Feb 14 14:29:47 2026
 50.52% done, estimate finish Sat Feb 14 14:29:47 2026
 50.66% done, estimate finish Sat Feb 14 14:29:47 2026
 50.80% done, estimate finish Sat Feb 14 14:29:47 2026
 50.94% done, estimate finish Sat Feb 14 14:29:47 2026
 51.08% done, estimate finish Sat Feb 14 14:29:47 2026
 51.22% done, estimate finish Sat Feb 14 14:29:47 2026
 51.36% done, estimate finish Sat Feb 14 14:29:47 2026
 51.50% done, estimate finish Sat Feb 14 14:29:47 2026
 51.64% done, estimate finish Sat Feb 14 14:29:47 2026
 51.78% done, estimate finish Sat Feb 14 14:29:47 2026
 51.92% done, estimate finish Sat Feb 14 14:29:47 2026
 52.06% done, estimate finish Sat Feb 14 14:29:47 2026
 52.20% done, estimate finish Sat Feb 14 14:29:47 2026
 52.34% done, estimate finish Sat Feb 14 14:29:47 2026
 52.48% done, estimate finish Sat Feb 14 14:29:47 2026
 52.62% done, estimate finish Sat Feb 14 14:29:47 2026
 52.76% done, estimate finish Sat Feb 14 14:29:47 2026
 52.90% done, estimate finish Sat Feb 14 14:29:47 2026
 53.04% done, estimate finish Sat Feb 14 14:29:47 2026
 53.18% done, estimate finish Sat Feb 14 14:29:47 2026
 53.32% done, estimate finish Sat Feb 14 14:29:47 2026
 53.46% done, estimate finish Sat Feb 14 14:29:47 2026
 53.60% done, estimate finish Sat Feb 14 14:29:47 2026
 53.74% done, estimate finish Sat Feb 14 14:29:47 2026
 53.88% done, estimate finish Sat Feb 14 14:29:47 2026
 54.02% done, estimate finish Sat Feb 14 14:29:47 2026
 54.16% done, estimate finish Sat Feb 14 14:29:47 2026
 54.30% done, estimate finish Sat Feb 14 14:29:47 2026
 54.44% done, estimate finish Sat Feb 14 14:29:47 2026
 54.58% done, estimate finish Sat Feb 14 14:29:47 2026
 54.72% done, estimate finish Sat Feb 14 14:29:47 2026
 54.86% done, estimate finish Sat Feb 14 14:29:47 2026
 55.00% done, estimate finish Sat Feb 14 14:29:47 2026
 55.14% done, estimate finish Sat Feb 14 14:29:47 2026
 55.28% done, estimate finish Sat Feb 14 14:29:47 2026
 55.42% done, estimate finish Sat Feb 14 14:29:47 2026
 55.56% done, estimate finish Sat Feb 14 14:29:47 2026
 55.70% done, estimate finish Sat Feb 14 14:29:47 2026
 55.84% done, estimate finish Sat Feb 14 14:29:47 2026
 55.98% done, estimate finish Sat Feb 14 14:29:47 2026
 56.12% done, estimate finish Sat Feb 14 14:29:47 2026
 56.26% done, estimate finish Sat Feb 14 14:29:47 2026
 56.40% done, estimate finish Sat Feb 14 14:29:47 2026
 56.54% done, estimate finish Sat Feb 14 14:29:47 2026
 56.68% done, estimate finish Sat Feb 14 14:29:47 2026
 56.82% done, estimate finish Sat Feb 14 14:29:47 2026
 56.96% done, estimate finish Sat Feb 14 14:29:47 2026
 57.10% done, estimate finish Sat Feb 14 14:29:47 2026
 57.24% done, estimate finish Sat Feb 14 14:29:47 2026
 57.38% done, estimate finish Sat Feb 14 14:29:47 2026
 57.52% done, estimate finish Sat Feb 14 14:29:47 2026
 57.66% done, estimate finish Sat Feb 14 14:29:47 2026
 57.80% done, estimate finish Sat Feb 14 14:29:47 2026
 57.94% done, estimate finish Sat Feb 14 14:29:47 2026
 58.08% done, estimate finish Sat Feb 14 14:29:47 2026
 58.22% done, estimate finish Sat Feb 14 14:29:47 2026
 58.36% done, estimate finish Sat Feb 14 14:29:47 2026
 58.50% done, estimate finish Sat Feb 14 14:29:47 2026
 58.64% done, estimate finish Sat Feb 14 14:29:47 2026
 58.78% done, estimate finish Sat Feb 14 14:29:47 2026
 58.92% done, estimate finish Sat Feb 14 14:29:47 2026
 59.06% done, estimate finish Sat Feb 14 14:29:47 2026
 59.20% done, estimate finish Sat Feb 14 14:29:47 2026
 59.34% done, estimate finish Sat Feb 14 14:29:47 2026
 59.48% done, estimate finish Sat Feb 14 14:29:47 2026
 59.62% done, estimate finish Sat Feb 14 14:29:47 2026
 59.76% done, estimate finish Sat Feb 14 14:29:47 2026
 59.89% done, estimate finish Sat Feb 14 14:29:47 2026
 60.04% done, estimate finish Sat Feb 14 14:29:47 2026
 60.18% done, estimate finish Sat Feb 14 14:29:47 2026
 60.32% done, estimate finish Sat Feb 14 14:29:47 2026
 60.45% done, estimate finish Sat Feb 14 14:29:47 2026
 60.60% done, estimate finish Sat Feb 14 14:29:47 2026
 60.74% done, estimate finish Sat Feb 14 14:29:47 2026
 60.88% done, estimate finish Sat Feb 14 14:29:47 2026
 61.01% done, estimate finish Sat Feb 14 14:29:47 2026
 61.16% done, estimate finish Sat Feb 14 14:29:47 2026
 61.30% done, estimate finish Sat Feb 14 14:29:47 2026
 61.44% done, estimate finish Sat Feb 14 14:29:47 2026
 61.57% done, estimate finish Sat Feb 14 14:29:47 2026
 61.72% done, estimate finish Sat Feb 14 14:29:47 2026
 61.86% done, estimate finish Sat Feb 14 14:29:47 2026
 61.99% done, estimate finish Sat Feb 14 14:29:47 2026
 62.13% done, estimate finish Sat Feb 14 14:29:47 2026
 62.28% done, estimate finish Sat Feb 14 14:29:47 2026
 62.42% done, estimate finish Sat Feb 14 14:29:47 2026
 62.55% done, estimate finish Sat Feb 14 14:29:47 2026
 62.69% done, estimate finish Sat Feb 14 14:29:47 2026
 62.84% done, estimate finish Sat Feb 14 14:29:47 2026
 62.98% done, estimate finish Sat Feb 14 14:29:47 2026
 63.11% done, estimate finish Sat Feb 14 14:29:47 2026
 63.25% done, estimate finish Sat Feb 14 14:29:47 2026
 63.40% done, estimate finish Sat Feb 14 14:29:47 2026
 63.54% done, estimate finish Sat Feb 14 14:29:47 2026
 63.67% done, estimate finish Sat Feb 14 14:29:47 2026
 63.81% done, estimate finish Sat Feb 14 14:29:47 2026
 63.96% done, estimate finish Sat Feb 14 14:29:47 2026
 64.10% done, estimate finish Sat Feb 14 14:29:47 2026
 64.23% done, estimate finish Sat Feb 14 14:29:47 2026
 64.37% done, estimate finish Sat Feb 14 14:29:47 2026
 64.52% done, estimate finish Sat Feb 14 14:29:47 2026
 64.65% done, estimate finish Sat Feb 14 14:29:47 2026
 64.79% done, estimate finish Sat Feb 14 14:29:47 2026
 64.93% done, estimate finish Sat Feb 14 14:29:47 2026
 65.08% done, estimate finish Sat Feb 14 14:29:47 2026
 65.21% done, estimate finish Sat Feb 14 14:29:47 2026
 65.35% done, estimate finish Sat Feb 14 14:29:47 2026
 65.49% done, estimate finish Sat Feb 14 14:29:47 2026
 65.64% done, estimate finish Sat Feb 14 14:29:47 2026
 65.77% done, estimate finish Sat Feb 14 14:29:47 2026
 65.91% done, estimate finish Sat Feb 14 14:29:47 2026
 66.05% done, estimate finish Sat Feb 14 14:29:47 2026
 66.20% done, estimate finish Sat Feb 14 14:29:47 2026
 66.33% done, estimate finish Sat Feb 14 14:29:47 2026
 66.47% done, estimate finish Sat Feb 14 14:29:47 2026
 66.61% done, estimate finish Sat Feb 14 14:29:47 2026
 66.76% done, estimate finish Sat Feb 14 14:29:47 2026
 66.89% done, estimate finish Sat Feb 14 14:29:47 2026
 67.03% done, estimate finish Sat Feb 14 14:29:47 2026
 67.17% done, estimate finish Sat Feb 14 14:29:47 2026
 67.31% done, estimate finish Sat Feb 14 14:29:47 2026
 67.45% done, estimate finish Sat Feb 14 14:29:47 2026
 67.59% done, estimate finish Sat Feb 14 14:29:47 2026
 67.73% done, estimate finish Sat Feb 14 14:29:47 2026
 67.87% done, estimate finish Sat Feb 14 14:29:47 2026
 68.01% done, estimate finish Sat Feb 14 14:29:47 2026
 68.15% done, estimate finish Sat Feb 14 14:29:47 2026
 68.29% done, estimate finish Sat Feb 14 14:29:47 2026
 68.43% done, estimate finish Sat Feb 14 14:29:47 2026
 68.57% done, estimate finish Sat Feb 14 14:29:47 2026
 68.71% done, estimate finish Sat Feb 14 14:29:47 2026
 68.85% done, estimate finish Sat Feb 14 14:29:47 2026
 68.99% done, estimate finish Sat Feb 14 14:29:47 2026
 69.13% done, estimate finish Sat Feb 14 14:29:47 2026
 69.27% done, estimate finish Sat Feb 14 14:29:47 2026
 69.41% done, estimate finish Sat Feb 14 14:29:47 2026
 69.55% done, estimate finish Sat Feb 14 14:29:47 2026
 69.69% done, estimate finish Sat Feb 14 14:29:47 2026
 69.83% done, estimate finish Sat Feb 14 14:29:47 2026
 69.97% done, estimate finish Sat Feb 14 14:29:47 2026
 70.11% done, estimate finish Sat Feb 14 14:29:47 2026
 70.25% done, estimate finish Sat Feb 14 14:29:47 2026
 70.39% done, estimate finish Sat Feb 14 14:29:47 2026
 70.53% done, estimate finish Sat Feb 14 14:29:47 2026
 70.67% done, estimate finish Sat Feb 14 14:29:47 2026
 70.81% done, estimate finish Sat Feb 14 14:29:47 2026
 70.95% done, estimate finish Sat Feb 14 14:29:47 2026
 71.09% done, estimate finish Sat Feb 14 14:29:47 2026
 71.23% done, estimate finish Sat Feb 14 14:29:47 2026
 71.37% done, estimate finish Sat Feb 14 14:29:47 2026
 71.51% done, estimate finish Sat Feb 14 14:29:47 2026
 71.65% done, estimate finish Sat Feb 14 14:29:47 2026
 71.79% done, estimate finish Sat Feb 14 14:29:47 2026
 71.93% done, estimate finish Sat Feb 14 14:29:47 2026
 72.07% done, estimate finish Sat Feb 14 14:29:47 2026
 72.21% done, estimate finish Sat Feb 14 14:29:47 2026
 72.35% done, estimate finish Sat Feb 14 14:29:47 2026
 72.49% done, estimate finish Sat Feb 14 14:29:47 2026
 72.63% done, estimate finish Sat Feb 14 14:29:47 2026
 72.77% done, estimate finish Sat Feb 14 14:29:47 2026
 72.91% done, estimate finish Sat Feb 14 14:29:47 2026
 73.05% done, estimate finish Sat Feb 14 14:29:47 2026
 73.19% done, estimate finish Sat Feb 14 14:29:47 2026
 73.33% done, estimate finish Sat Feb 14 14:29:47 2026
 73.47% done, estimate finish Sat Feb 14 14:29:47 2026
 73.61% done, estimate finish Sat Feb 14 14:29:47 2026
 73.75% done, estimate finish Sat Feb 14 14:29:47 2026
 73.89% done, estimate finish Sat Feb 14 14:29:47 2026
 74.03% done, estimate finish Sat Feb 14 14:29:47 2026
 74.17% done, estimate finish Sat Feb 14 14:29:47 2026
 74.31% done, estimate finish Sat Feb 14 14:29:47 2026
 74.45% done, estimate finish Sat Feb 14 14:29:47 2026
 74.59% done, estimate finish Sat Feb 14 14:29:47 2026
 74.73% done, estimate finish Sat Feb 14 14:29:47 2026
 74.87% done, estimate finish Sat Feb 14 14:29:47 2026
 75.01% done, estimate finish Sat Feb 14 14:29:47 2026
 75.15% done, estimate finish Sat Feb 14 14:29:47 2026
 75.29% done, estimate finish Sat Feb 14 14:29:47 2026
 75.43% done, estimate finish Sat Feb 14 14:29:47 2026
 75.57% done, estimate finish Sat Feb 14 14:29:47 2026
 75.71% done, estimate finish Sat Feb 14 14:29:47 2026
 75.85% done, estimate finish Sat Feb 14 14:29:47 2026
 75.99% done, estimate finish Sat Feb 14 14:29:47 2026
 76.13% done, estimate finish Sat Feb 14 14:29:47 2026
 76.27% done, estimate finish Sat Feb 14 14:29:47 2026
 76.41% done, estimate finish Sat Feb 14 14:29:47 2026
 76.55% done, estimate finish Sat Feb 14 14:29:47 2026
 76.69% done, estimate finish Sat Feb 14 14:29:47 2026
 76.83% done, estimate finish Sat Feb 14 14:29:47 2026
 76.97% done, estimate finish Sat Feb 14 14:29:47 2026
 77.11% done, estimate finish Sat Feb 14 14:29:47 2026
 77.25% done, estimate finish Sat Feb 14 14:29:47 2026
 77.39% done, estimate finish Sat Feb 14 14:29:47 2026
 77.53% done, estimate finish Sat Feb 14 14:29:47 2026
 77.67% done, estimate finish Sat Feb 14 14:29:47 2026
 77.81% done, estimate finish Sat Feb 14 14:29:47 2026
 77.95% done, estimate finish Sat Feb 14 14:29:47 2026
 78.09% done, estimate finish Sat Feb 14 14:29:47 2026
 78.23% done, estimate finish Sat Feb 14 14:29:47 2026
 78.37% done, estimate finish Sat Feb 14 14:29:47 2026
 78.51% done, estimate finish Sat Feb 14 14:29:47 2026
 78.65% done, estimate finish Sat Feb 14 14:29:47 2026
 78.79% done, estimate finish Sat Feb 14 14:29:47 2026
 78.93% done, estimate finish Sat Feb 14 14:29:47 2026
 79.07% done, estimate finish Sat Feb 14 14:29:47 2026
 79.21% done, estimate finish Sat Feb 14 14:29:47 2026
 79.35% done, estimate finish Sat Feb 14 14:29:47 2026
 79.49% done, estimate finish Sat Feb 14 14:29:47 2026
 79.63% done, estimate finish Sat Feb 14 14:29:47 2026
 79.77% done, estimate finish Sat Feb 14 14:29:47 2026
 79.91% done, estimate finish Sat Feb 14 14:29:47 2026
 80.05% done, estimate finish Sat Feb 14 14:29:47 2026
 80.19% done, estimate finish Sat Feb 14 14:29:47 2026
 80.33% done, estimate finish Sat Feb 14 14:29:47 2026
 80.47% done, estimate finish Sat Feb 14 14:29:47 2026
 80.61% done, estimate finish Sat Feb 14 14:29:47 2026
 80.75% done, estimate finish Sat Feb 14 14:29:47 2026
 80.89% done, estimate finish Sat Feb 14 14:29:47 2026
 81.03% done, estimate finish Sat Feb 14 14:29:47 2026
 81.17% done, estimate finish Sat Feb 14 14:29:47 2026
 81.31% done, estimate finish Sat Feb 14 14:29:47 2026
 81.45% done, estimate finish Sat Feb 14 14:29:47 2026
 81.59% done, estimate finish Sat Feb 14 14:29:47 2026
 81.73% done, estimate finish Sat Feb 14 14:29:47 2026
 81.87% done, estimate finish Sat Feb 14 14:29:47 2026
 82.01% done, estimate finish Sat Feb 14 14:29:47 2026
 82.15% done, estimate finish Sat Feb 14 14:29:47 2026
 82.29% done, estimate finish Sat Feb 14 14:29:47 2026
 82.43% done, estimate finish Sat Feb 14 14:29:47 2026
 82.57% done, estimate finish Sat Feb 14 14:29:47 2026
 82.71% done, estimate finish Sat Feb 14 14:29:47 2026
 82.84% done, estimate finish Sat Feb 14 14:29:47 2026
 82.99% done, estimate finish Sat Feb 14 14:29:47 2026
 83.13% done, estimate finish Sat Feb 14 14:29:47 2026
 83.27% done, estimate finish Sat Feb 14 14:29:47 2026
 83.40% done, estimate finish Sat Feb 14 14:29:47 2026
 83.55% done, estimate finish Sat Feb 14 14:29:47 2026
 83.69% done, estimate finish Sat Feb 14 14:29:47 2026
 83.83% done, estimate finish Sat Feb 14 14:29:47 2026
 83.96% done, estimate finish Sat Feb 14 14:29:47 2026
 84.11% done, estimate finish Sat Feb 14 14:29:47 2026
 84.25% done, estimate finish Sat Feb 14 14:29:47 2026
 84.39% done, estimate finish Sat Feb 14 14:29:47 2026
 84.52% done, estimate finish Sat Feb 14 14:29:47 2026
 84.67% done, estimate finish Sat Feb 14 14:29:47 2026
 84.81% done, estimate finish Sat Feb 14 14:29:47 2026
 84.95% done, estimate finish Sat Feb 14 14:29:47 2026
 85.08% done, estimate finish Sat Feb 14 14:29:47 2026
 85.23% done, estimate finish Sat Feb 14 14:29:47 2026
 85.37% done, estimate finish Sat Feb 14 14:29:47 2026
 85.50% done, estimate finish Sat Feb 14 14:29:47 2026
 85.64% done, estimate finish Sat Feb 14 14:29:47 2026
 85.79% done, estimate finish Sat Feb 14 14:29:47 2026
 85.93% done, estimate finish Sat Feb 14 14:29:47 2026
 86.06% done, estimate finish Sat Feb 14 14:29:47 2026
 86.20% done, estimate finish Sat Feb 14 14:29:47 2026
 86.35% done, estimate finish Sat Feb 14 14:29:47 2026
 86.49% done, estimate finish Sat Feb 14 14:29:47 2026
 86.62% done, estimate finish Sat Feb 14 14:29:47 2026
 86.76% done, estimate finish Sat Feb 14 14:29:47 2026
 86.91% done, estimate finish Sat Feb 14 14:29:47 2026
 87.05% done, estimate finish Sat Feb 14 14:29:47 2026
 87.18% done, estimate finish Sat Feb 14 14:29:47 2026
 87.32% done, estimate finish Sat Feb 14 14:29:47 2026
 87.47% done, estimate finish Sat Feb 14 14:29:47 2026
 87.61% done, estimate finish Sat Feb 14 14:29:47 2026
 87.74% done, estimate finish Sat Feb 14 14:29:47 2026
 87.88% done, estimate finish Sat Feb 14 14:29:47 2026
 88.02% done, estimate finish Sat Feb 14 14:29:47 2026
 88.17% done, estimate finish Sat Feb 14 14:29:47 2026
 88.31% done, estimate finish Sat Feb 14 14:29:47 2026
 88.44% done, estimate finish Sat Feb 14 14:29:47 2026
 88.58% done, estimate finish Sat Feb 14 14:29:47 2026
 88.73% done, estimate finish Sat Feb 14 14:29:47 2026
 88.86% done, estimate finish Sat Feb 14 14:29:47 2026
 89.00% done, estimate finish Sat Feb 14 14:29:47 2026
 89.14% done, estimate finish Sat Feb 14 14:29:47 2026
 89.29% done, estimate finish Sat Feb 14 14:29:47 2026
 89.42% done, estimate finish Sat Feb 14 14:29:47 2026
 89.56% done, estimate finish Sat Feb 14 14:29:47 2026
 89.70% done, estimate finish Sat Feb 14 14:29:47 2026
 89.85% done, estimate finish Sat Feb 14 14:29:47 2026
 89.98% done, estimate finish Sat Feb 14 14:29:47 2026
 90.12% done, estimate finish Sat Feb 14 14:29:47 2026
 90.26% done, estimate finish Sat Feb 14 14:29:47 2026
 90.41% done, estimate finish Sat Feb 14 14:29:47 2026
 90.54% done, estimate finish Sat Feb 14 14:29:47 2026
 90.68% done, estimate finish Sat Feb 14 14:29:47 2026
 90.82% done, estimate finish Sat Feb 14 14:29:47 2026
 90.96% done, estimate finish Sat Feb 14 14:29:47 2026
 91.10% done, estimate finish Sat Feb 14 14:29:47 2026
 91.24% done, estimate finish Sat Feb 14 14:29:47 2026
 91.38% done, estimate finish Sat Feb 14 14:29:47 2026
 91.52% done, estimate finish Sat Feb 14 14:29:47 2026
 91.66% done, estimate finish Sat Feb 14 14:29:47 2026
 91.80% done, estimate finish Sat Feb 14 14:29:47 2026
 91.94% done, estimate finish Sat Feb 14 14:29:47 2026
 92.08% done, estimate finish Sat Feb 14 14:29:47 2026
 92.22% done, estimate finish Sat Feb 14 14:29:47 2026
 92.36% done, estimate finish Sat Feb 14 14:29:47 2026
 92.50% done, estimate finish Sat Feb 14 14:29:47 2026
 92.64% done, estimate finish Sat Feb 14 14:29:47 2026
 92.78% done, estimate finish Sat Feb 14 14:29:47 2026
 92.92% done, estimate finish Sat Feb 14 14:29:47 2026
 93.06% done, estimate finish Sat Feb 14 14:29:47 2026
 93.20% done, estimate finish Sat Feb 14 14:29:47 2026
 93.34% done, estimate finish Sat Feb 14 14:29:47 2026
 93.48% done, estimate finish Sat Feb 14 14:29:47 2026
 93.62% done, estimate finish Sat Feb 14 14:29:47 2026
 93.76% done, estimate finish Sat Feb 14 14:29:47 2026
 93.90% done, estimate finish Sat Feb 14 14:29:47 2026
 94.04% done, estimate finish Sat Feb 14 14:29:47 2026
 94.18% done, estimate finish Sat Feb 14 14:29:47 2026
 94.32% done, estimate finish Sat Feb 14 14:29:47 2026
 94.46% done, estimate finish Sat Feb 14 14:29:47 2026
 94.60% done, estimate finish Sat Feb 14 14:29:47 2026
 94.74% done, estimate finish Sat Feb 14 14:29:47 2026
 94.88% done, estimate finish Sat Feb 14 14:29:47 2026
 95.02% done, estimate finish Sat Feb 14 14:29:47 2026
 95.16% done, estimate finish Sat Feb 14 14:29:47 2026
 95.30% done, estimate finish Sat Feb 14 14:29:47 2026
 95.44% done, estimate finish Sat Feb 14 14:29:47 2026
 95.58% done, estimate finish Sat Feb 14 14:29:47 2026
 95.72% done, estimate finish Sat Feb 14 14:29:47 2026
 95.86% done, estimate finish Sat Feb 14 14:29:47 2026
 96.00% done, estimate finish Sat Feb 14 14:29:47 2026
 96.14% done, estimate finish Sat Feb 14 14:29:47 2026
 96.28% done, estimate finish Sat Feb 14 14:29:47 2026
 96.42% done, estimate finish Sat Feb 14 14:29:47 2026
 96.56% done, estimate finish Sat Feb 14 14:29:47 2026
 96.70% done, estimate finish Sat Feb 14 14:29:47 2026
 96.84% done, estimate finish Sat Feb 14 14:29:47 2026
 96.98% done, estimate finish Sat Feb 14 14:29:47 2026
 97.12% done, estimate finish Sat Feb 14 14:29:47 2026
 97.26% done, estimate finish Sat Feb 14 14:29:47 2026
 97.40% done, estimate finish Sat Feb 14 14:29:47 2026
 97.54% done, estimate finish Sat Feb 14 14:29:47 2026
 97.68% done, estimate finish Sat Feb 14 14:29:47 2026
 97.82% done, estimate finish Sat Feb 14 14:29:47 2026
 97.96% done, estimate finish Sat Feb 14 14:29:47 2026
 98.10% done, estimate finish Sat Feb 14 14:29:47 2026
 98.24% done, estimate finish Sat Feb 14 14:29:47 2026
 98.38% done, estimate finish Sat Feb 14 14:29:47 2026
 98.52% done, estimate finish Sat Feb 14 14:29:47 2026
 98.66% done, estimate finish Sat Feb 14 14:29:47 2026
 98.80% done, estimate finish Sat Feb 14 14:29:47 2026
 98.94% done, estimate finish Sat Feb 14 14:29:47 2026
 99.08% done, estimate finish Sat Feb 14 14:29:47 2026
 99.22% done, estimate finish Sat Feb 14 14:29:47 2026
 99.36% done, estimate finish Sat Feb 14 14:29:47 2026
 99.50% done, estimate finish Sat Feb 14 14:29:47 2026
 99.64% done, estimate finish Sat Feb 14 14:29:47 2026
 99.78% done, estimate finish Sat Feb 14 14:29:47 2026
 99.92% done, estimate finish Sat Feb 14 14:29:47 2026
Total translation table size: 0
Total rockridge attributes bytes: 740
Total directory bytes: 2398
Path table size(bytes): 22
Max brk space used 0
357295 extents written (697 MB)

mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid Backup
26-02-02 -volset  -appid K3B THE CD KREATOR (C) 1998-2018 SEBASTIAN TRUEG,
MICHAL MALEK AND LESLIE ZHAI -publisher Kreutzmann -preparer  -sysid LINUX
-volset-size 1 -volset-seqno 1 -sort /tmp/k3b.mFATnM -rational-rock -hide-list
/tmp/k3b.BRTcEx -joliet -joliet-long -hide-joliet-list /tmp/k3b.gGUKbx
-no-cache-inodes -full-iso9660-filenames -iso-level 3 -path-list
/tmp/k3b.sFgKbN

mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid Backup 26-02-02 -volset  -appid
K3B THE CD KREATOR (C) 1998-2018 SEBASTIAN TRUEG, MICHAL MALEK AND LESLIE ZHAI
-publisher Kreutzmann -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1
-sort /tmp/k3b.AzCnaC -rational-rock -hide-list /tmp/k3b.avNSBS -joliet
-joliet-long -hide-joliet-list /tmp/k3b.DuwpQf -no-cache-inodes
-full-iso9660-filenames -iso-level 3 -path-list /tmp/k3b.qHbyoY

-- 
You are receiving this mail because:
You are watching all bug changes.

Reply via email to