https://bugs.kde.org/show_bug.cgi?id=452020

            Bug ID: 452020
           Summary: the priority of todo in the summary section should
                    with be uncompleted ones (or some sorting options)
           Product: kontact
           Version: 5.18.1
          Platform: Other
                OS: Linux
            Status: REPORTED
          Severity: normal
          Priority: NOR
         Component: summary
          Assignee: [email protected]
          Reporter: [email protected]
  Target Milestone: ---

Created attachment 147809
  --> https://bugs.kde.org/attachment.cgi?id=147809&action=edit
screenshot :: to-dos of "summary" -> Kontact

in the summary section, Pending To-dos, when I decide to show completed to-dos
with non-completed to-dos, always the list starts with "completed" ones. 
In Korganizer there was an option that allow moving completed to-dos to the end
of the list. but in Kontact->summary, there is nothing.
In my opinion, it is essential to add this option to the summary, because the
summary would show the most important works and to-dos! I'm sure that completed
to-dos are less important than uncompleted to-dos.

-- 
You are receiving this mail because:
You are the assignee for the bug.

Reply via email to